Channel Avatar

Erigworld-Ajay Verma @UCzrzmwdiF1rfw1L9khO66zg@youtube.com

7.1K subscribers - no pronouns :c

Hi! Ajay Verma is a founder/Director of Rig world Multi Serv


01:40
Subsea Well Control Training | IWCF | IWCF Drilling Level 4 | IWCF Drilling Level 3
01:43
IWCF Level 4 |sequence of the RAM close function from a remote panel | Well Control | IWCF Level 3
02:36
IWCF Drilling Level 4 | IWCF Well Control Training | IWCF Level 3 | Online Well Control Training
07:30
IWCF Drilling Level 3 | IWCF Well control Training | Mastering IWCF Well Control in 7 Days
12:25
IWCF Kill Sheet example | IWCF Drilling Level 4 | IWCF Drilling Level 3 | How to Solve kill sheet |
07:30
IWCF Drilling Level 4 | IWCF Drilling Level 3 | Mastering IWCF Well Control in 7 Days | Well control
01:13
Hydrostatic Pressure | How to calcuale hydrostatic pressure with formaula | IWCF | IWCF Mock test |
05:11
IWCF Drilling Level 4 | IWCF Drilling Level 3 | Mastering IWCF Well Control in 7 Days | Well control
00:05
Are You Ready to Take Well Control Game Challenge. Click on the link to get started.
01:14
Drilling Mud Knowledge Hindi
01:16
Answer of Casing Float Fail
00:24
IWCF Drilling Level 4 | IWCF Drilling Level 3 | IADC Stuck Pipe | Safety Courses | Well Control
01:47
P2 Q1 F Hindi
03:37
IWCF Solving Gas Migration Puzzle in Closed Wells: Float Valve Pressure Revelation!"
04:56
IWCF Soft Shut in Procedure | Question Introduction Paper 2 P1Q26 | IWCF Mock Question| Well Control
02:12
IWCF Hard shut in Procedure while Drilling operation | IWCF Drilling Level 4 | IWCF Drilling Level 3
00:52
IWCF | Why Pit level sensors be kept clean from dry mud | Kick detection | IntroP2Q30 | Well Control
01:19
IWCF Drilling Level 4 | How to choose a BOP Configuration that is most suitable for your well
01:04
IWCF Drilling Level 4 | Test Plug | Assignment Question P127 Q90 | IWCF | IADC | Well Control |
01:48
IWCF Level 4 | Well Control | when you should function test Divertor system as per API
04:51
Rigworld E-Learning Platform | Rigworld Multiservices Pvt. ltd. | Erigworld | Ajay Verma
02:50
IWCF Drilling Level 4 | Accumulator | IWCF Drilling Level 3 | Additional QuestionSS 4 | Well Control
00:52
Test Plug | Additional Question_SS 15 | IWCF | IADC | Erigworld | Well Control | Ajay Verma
04:16
IWCF Drilling Level 4 | MGS | Additional Questions SS 18 | IWCF Drilling Level 3
02:18
IWCF Level 4 | IWCF Level 3 | Warning Signs | Additional Question_SS 22 | IADC | Well Control
01:07
IWCF Level 4 | Swabbing | Additional Question_SS 24 | IWCF | IADC | Well Control
02:04
IWCF Virtual Coach | IWCF Well Control Questions | Drilling Course | Well Intervention | Ajay verma
01:41
IWCF Level 4 | IWCF Level 3 | Insert type Diverter | Assignment Question P114 Q51 | Well Control
01:11
IWCF Level 4 | IWCF Level 3 |What is the purpose of Weep hole | RAM BOP| P122 Q73 | IADC
03:09
HOW TO FIND ICP IF KILL RATE IS NOT KNOWN DURING WELL KILLING | IWCF PREPARATION COURSE | P48 Q149
03:48
How to answer BHP question in IWCF exam | BHP during Drillers Method | IWCF Preparation | P57 Q181
01:25
Introductory Paper 1 P1Q3 Hindi | Basic Well control | IWCF question | Hydrostatic Pressure | BHP
00:25
Introductory paper 1 P1Q8 Hindi | IWCF Well control | IWCF question | Hydrostatic Pressure | BHP
02:32
Introductory Paper 1 P1Q7 Hindi | IWCF Well control | IWCF question | Hydrostatic Pressure | BHP
00:56
Introductory Paper 1 P1Q6 Hindi | Basic Well control | IWCF question | Hydrostatic Pressure | BHP
01:42
Introductory Paper 1 P1Q5 Hindi | IWCF Well control | IWCF question | Hydrostatic Pressure | BHP
00:53
Introductory Paper 1 P1Q4 Hindi | IWCF Well control | IWCF question | Hydrostatic Pressure | BHP
01:26
Introductory Paper 1 P1Q2 Hindi | IWCF Well control | IWCF question | Hydrostatic Pressure | BHP
01:56
Introductory paper 1 P1 Q1 Hindi | IWCF Well control | IWCF question | Hydrostatic Pressure | BHP
01:23
Basic Well control | IWCF question | Hydrostatic Pressure | BHP | What is IWCF |Paper 2 P1Q4 Eng
01:02
Basic Well control | IWCF question | Well Killing Plan | What is IWCF | Introductory Paper 2 P1Q3 En
00:49
Introductory Paper 2 P1Q2 Eng | IWCF Well control | IWCF question | BOP Rating | What is IWCF
00:52
IWCF Well control | IWCF question | Mud pit sensor | What is IWCF | Introductory paper 1 P1Q10 Eng
01:40
IWCF Well control | IWCF question | Mud management | What is IWCF | introductory paper 1 P1Q9 Eng
00:27
IWCF Well control | IWCF question | well kick | What is IWCF | Introductory paper 1 P1Q8 Eng
02:18
IWCF Well control | IWCF question | Mud transfer | What is IWCF | Introductory paper 1 P1Q7 Eng
00:36
Basic Well control | IWCF question | Types of Barrier | What is IWCF | Introductory paper 1P1Q6 Eng
01:40
Basic Well control | IWCF question | Mud balance | What is IWCF | Introductory paper 1 P1Q5 Eng
00:56
Basic Well control | IWCF question | Drilling | IWCF paper | Influx type| Introductory Paper P1Q4 E
01:56
Basic Well control | IWCF question | Mud properties | What is IWCF | Introductory Paper 1 P1Q3 Eng
01:39
Well control | IWCF Assignment question | IWCF well control | Introductory Paper 1 P1Q2 Eng
02:30
Maximum Anticipated Surface Pressure | IWCF Assignment question P2 Q1 F | IADC | Intro 1 P1Q1 Eng
05:40
Trip Margin | IWCF Level 4 | Assignment question | well control | What is trip margin | IWCF | IADC
01:01
De-gasser | IWCF Question | IADC Assignment | Well control | MGS | Vacuum Degasser| PAPER 2 P1Q28
00:43
IWCF well control| IWCF assignment question 2022 | Shut in RAM BOP | Drilling problems | 2 P1Q29
02:25
Mud Gas Separator(MGS) | Poor Boy Degasser | How it works | IWCF | IADC | Well-control | Drilling
00:25
Wishing you a perfect Merry Christmas. May God shower you with new opportunities & lots of blessings
02:37
How To Access IWCF Virtual Mock Test Demo| IWCF | IWCF Preparation | IWCF online exam |
06:15
U-Tube Drilling Concept: video you learn the U-Tube drilling concept | Drilling | IWCF |Well control
01:54
Introducing an E-learning platform for Oil & Gas industry.www.erigworld.com