Channel Avatar

Gershan Barnard @UCyF-al_8Iy1ZELrpNFF-FaQ@youtube.com

57 subscribers

Empty mind, I’m an empty head…


07:41
Critical thinking…
20:05
Agreement
18:17
Circumstances affecting consensus
12:34
Performance, personal rights, creditors and debtors
30:53
Synchronous machines
16:35
Engineering Contracts - Obligations, the concepts of contract and requirements for validity
05:01
Highlight 9:25 – 14:25 from Gershan Barnard is live
05:18
Wind turbines (part 2)
05:10
Wind turbines (part 1)
11:24
FACTS (part 3)
08:44
FACTS (part2)
07:50
Flexible AC Transmission Systems (FACTS)
11:47
Power loss ratio
07:03
Visualisation of average value
15:34
Townsend second Ionisation coefficient
10:25
High Voltage: cathode processes - secondary effects.
11:30
1.2 Townsend’s first ionisation coefficient.
10:53
High voltage: mechanism of breakdown of gases (part c)
10:55
High voltage: mechanism of breakdown of gases (part b)
09:10
High Voltage: Mechanism of Breakdown of gases (part a)
05:25
High Voltage: introduction
04:19
High Voltage DC transmission (part d).
07:07
High Voltage DC transmission (part c).
09:02
High Voltage DC transmission (part b).
09:32
High Voltage DC transmission (part a).
11:29
Protection of switching devices by using snubbers (Part D)
02:53
Protection of switching devices by using snubbers (Part C).
06:26
Protection of switching devices by using snubbers (Part B)
05:28
Protection of switching devices by using snubbers (Part A)
16:43
Turn-on snubber circuit derivation (part 2).
05:05
Turn-on Snubber circuit and diagram (part 1).
05:18
I shouldn’t have time…
17:28
Internal dialogue
05:22
Spoiling your kids - part 2
06:59
Spoiling your kids - part 1
00:16
Occupatus opus
12:46
Masterbation (continued)
12:22
Masterbation
00:25
Hand made dining table
00:33
I suck.
11:20
My view on politics
10:38
Manipulation through idealistic speech.
09:17
The marriage of Jada and Will Smith.
15:50
The Sovereignty of God.
07:55
Job hunting advice
06:16
Faith in God…
01:04
A gift
01:03
The massaging miracle
00:16
3-phase motor inspection.
00:13
Noise generated by an Audi engine flywheel backplate.
00:12
Camshaft inspection
00:11
Perfect clutch plate alignment on a school bus engine flywheel
00:22
Successful HST pump removal from a Komatsu WA200 Front End Loader
00:18
Removing an airlock from the system
00:13
Stemming truck
00:25
Dissembling the Komatsu WA200 FEL for line-boring on its articulation
00:14
Hydraulic piping of the Komatsu WA200 Front-end Wheel loaders
00:19
Biggest Front-end loader on the planet.
00:15
Generator fixed
00:19
Generator not starting