Channel Avatar

Cross country pipeline @UCxJZqcpKipf1bCLPmc9mJBQ@youtube.com

635 subscribers - no pronouns :c

Pipline, piping, structure job procedures, site activities,


00:55
RTFI
00:14
Dead weight Setup... Mainline Hydrotesting
00:11
36" API 5L pipe shifting
00:58
Hydrotesting pressurizing
00:25
42 inch horizontal direction drilling.24" reaming.
02:04
36" pipe pulling
00:11
pipe shifting
01:07
Pipeline Vacuum Drying for 6km 6OD pipe.
00:27
Horizontal direction drilling 36"in reaming
00:38
Surface preparation by copper slag Blasting
01:21
Metering skid
00:44
Valve seat Hydrotesting
00:51
28" barrel reamer.36" HDD IOCL NMPPL project.
00:09
RIG SET Up
00:28
Metering skid Unloading at combined CGS station
00:23
36in HDD , Barrel reaming for soil type HDD
06:26
Face bend test
00:10
RCC of skid foundation
00:22
Manson affecting ROU
03:12
36"API 5L pope SMAW welding
00:41
Pipeline lowering
00:15
36" API5L X70 pipe cutting
00:54
Cross country pipeline lowering
00:16
NH844 rock breaking
00:08
excavation
00:34
Spool erection
01:16
Metering skid CGS
02:04
3LPE coating by copper blasting
08:25
ACDB panel along with AMF & ABB panel
00:28
Piping Spool welding
00:16
TR Unit On/Off timer set
00:20
PSP check at the test station off potential.
00:46
TR unit ON/OFF PSP check
00:55
HDD reaming
01:29
Intermediate pigging station
02:30
CGS Station
00:15
December 12, 2023
05:31
All weld tensile strength
07:57
Transverse Tensile Test as per API1104
00:53
#station #piping #construction #engineer #civil #pipeline #crosscountry #mechanical
00:47
SOLAR PANEL
00:10
#hdd #rig #heavymachinery #XCMG286 #construction #tunnelling
01:43
windmill #engineer #energy #wind #power
02:20
#aircraft #engine #turboengine #jetengine
06:51
Cube preparation for 7/28 days cube test
05:35
Mianline lowering
00:22
XCMG1350 with 167HP mud motor and 350HP mud pump.Pilot under progress.
00:18
XCMG 1350
02:07
XCMG HDD machine
00:11
Dangote refinery Africa largest refinery
00:49
8" Gail gas line post hydrotest.
00:15
Cleaning header 28"X 24" in making
01:31
Semiautomatic GMAW welding demo with E7056 1.2 mm filler.
01:31
42" semiautomatic welding GMAW/FCAW set up
00:21
Offsite piping at Dangote refinery
00:16
flare line of Dangote refinery
00:20
lowering of the mainline section
00:18
Pipeline section of ETBPNMPTL pipeline project of Enprocon Enterprises Limited
01:14
SMAW welding
02:52
Cross-country pipeline route with SV station