Channel Avatar

Yixin China @UCvtquxPPYDTZ2RjDxvii04w@youtube.com

2.9K subscribers - no pronouns :c

Professional railway equipment manufacture.Main products rai


00:16
Railway track replacement operations
01:19
Aluminothermic welding technology
00:23
Centralized Railway Repair
00:34
Centralized Railway Repair
00:46
Railway electrical repair
00:15
Railway construction site at an altitude of 5067 meters
00:26
Rail grinding
00:39
Real footage of the railway track replacement construction site
00:37
Safety inspection process before train operation
00:43
A ruler in the hands of a railway engineer
00:26
Rail grinding
00:36
Changing wheels on a train
00:40
Track speed reducer
00:32
Train wheel maintenance
01:16
Railway Slope Shaping
01:14
The reason why green trains are not afraid of rain, snow and freezing weather
01:05
Centralized Railway Repair
02:20
The whole process of building a ballastless track for high-speed railway
01:15
How do "diamond crossings" on railroad tracks work?
01:11
How to maintain worn rails
01:12
Grinding rails
01:14
The rail laying process is fully mechanized, with 2 kilometers of track laid per day.
01:51
Railway arch bridge construction animation
00:36
Freight train wheel replacement
01:16
Railway sleeper replacement operation
00:45
Railway night concentrated repair
00:31
15 km/h, double-track ultrasonic flaw detector
00:33
A large tamping vehicle is in operation.
00:21
EMU reconnection
01:37
High-speed rail wheel manufacturing process
01:23
6 3铁路工务更换道岔施工作业
01:21
High-speed rail track changing site
01:25
Rail transportation
01:06
Rail rolling process
01:04
4 20插铺道岔
01:09
Train wheel manufacturing process
01:15
Railway electrical maintenance centralized repair
01:01
Railway sleeper replacement operation
00:28
EMU maintenance
01:19
Fuxing rain experiment
00:36
Rail grinding work
01:45
Tunnel drilling and blasting construction process flow
01:03
The train changes lanes at the interchange.
00:31
Railway centralized repair site.
00:43
Replace sleepers and rails.
00:43
High-speed rail train bottom inspection equipment
01:08
Rapid ice melting and snow removal by high-speed rail moving units.
02:51
2 21
00:13
Equipment maintenance during Spring Festival
00:29
Turnout snow curtain
00:28
1 20下午桥隧清筛作业
00:26
Inspection before rail welding
00:10
Replace rail fasteners
00:14
Train moving in the night.
01:01
Welding long rail operations
01:43
Thermite welding technology
00:18
Railway sleeper disassembly operation
00:26
Train bogie.
01:07
Stress Relief Operation