Channel Avatar

Cubis Systems @UCqxhqFGtbkANJnCc_3Z86vA@youtube.com

380 subscribers - no pronouns :c

Cubis is the global leader in the design and manufacture of


00:21
Cubis UK - Website Launch Video - November 2023
01:37
HOW TO | Install STAKKAbox™ JMF | Access Chamber | Cubis Systems
02:41
HOW TO | Install STAKKAbox™ ULTIMA Connect | Access Chamber | Cubis Systems
07:38
PRODUCT OVERVIEW | Modular Cabinet Base System | Trackside Asset Protection | Cubis Systems
04:30
Fascicule de mise en œuvre gamme modulaire Cubis
01:42
PRODUCT OVERVIEW | PROtrough™ | Cable Protection System | Cable Trough | Trough | Cubis Systems
02:05
Cubis Supports Advanced Transport & Infrastructure National College for HS2
00:51
PRODUCT OVERVIEW | STAKKAbox™ Access Chamber | Water | Retrofit Overbuild Solution | Cubis Systems
03:10
HOW TO | Repair a Damaged Meter Box | Product Installation | Mitras™ Meterboxes
00:51
HOW TO | Replace a Meter Box Latch | Product Installation | Mitras™ Meterboxes
00:38
HOW TO | Replace a Pin Hinge on a Meter Box Door | Product Installation | Mitras™ Meterboxes
00:54
HOW TO | Replace an MK1 Meter Box Door and Cover | Product Installation | Mitras™ Meterboxes
00:52
HOW TO | Replace a Pin Hinged Meter Box Door | Product Installation | Mitras™ Meterboxes
00:37
HOW TO | Remove AX-S™ Concrete Covers | Access Cover | Cubis Systems
01:30
TESTING | Sub Security Cover | Fire Test | Cubis Systems
00:20
HOW TO | Remove AX-S™ Composite Covers | Access Cover | Cubis Systems
00:41
HOW TO | Remove AX-S™ Recessed Covers | Access Cover | Cubis Systems
01:22
HOW TO | Install Guardian Goalposts | Overhead Line Warning System | Cubis Systems
05:00
HOW TO | Install Conductive Concrete | SAN EARTH | Electrical Grounding | Cubis Systems
01:09
HOW TO | Install MULTIduct™ Duct Bank System for Under Track Crossing | UTX | Cubis Systems
02:42
HOW TO | Install MULTIduct™ Duct Bank System for Under Road Crossing | URX | Cubis Systems
02:27
PRODUCT COMPARISON | STAKKAbox™Access Chamber VS Brick Build Chamber | Footway Chamber | Trial
01:14
CASE STUDY | Water Meter Chamber Installation | STAKKAbox™ ULTIMA | Cubis Systems
03:40
CASE STUDY | Waste Water Treatment Works Installation | MCC Chamber | MCC Kiosk | Cubis Systems
01:32
CASE STUDY | Manchester Metro Link Installation | MULTIduct™ Cable Protection System | Cubis Systems
04:59
CASE STUDY | Manchester Metro Link Installation | FLEXI Pit Drainage Catchpit | Cubis Systems
02:57
CASE STUDY | London Olympic Stadium Redevelopment | STAKKAbox™ ULTIMA Connect | Cubis Systems
05:45
CASE STUDY | Doncaster Flood Prevention Project | FLEXI Pit Drainage Catchpit | Cubis Systems
03:34
PRODUCT OVERVIEW | Network Access Solutions | Network Infrastructure Products | Cubis Systems
01:27
BIM & Digital Construction Launch | BIM Library | BIM Objects | Digital Product Info | Cubis Systems
06:50
CASE STUDY | Installation d’une chambre modulaire composite Cubis sur le réseau d’Eau Potable FR
01:16
CASE STUDY | Water Access System | Cubis Systems FR
01:47
PRODUCT OVERVIEW | MULTIduct™ | Cable Protection | Cable Management | Duct System | Cubis Systems FR
01:52
PRODUCT OVERVIEW | STAKKAbox™ ULTIMA Connect | Access Chamber | Manhole | Cubis Systems FR
02:19
CASE STUDY | Arley Tunnel Drainage/Earthworks Project | FLEXI Pit Drainage Catchpit | Cubis Systems
01:40
CASE STUDY | Merseyrail Rail Infrastructure Project | STAKKAbox™ ULTIMA | UTX | Cubis Systems
01:49
CASE STUDY | M8, M73 and M74 Bridge Crossing | MULTIduct™ Cable Protection System | Cubis Systems
02:42
CASE STUDY | Translink Multimodal Transport Hub Rail Project | STAKKAbox™ Fortress | Cubis Systems
01:55
CASE STUDY | Birmingham City Centre Metro Link Project | STAKKAbox™ ULTIMA Connect | Cubis Systems
01:13
BIM Demonstration | BIM Library | BIM Objects | Digital Product Information | Cubis Systems
01:34
BIM & Digital Construction Demo | BIM Library | BIM Objects | Digital Product Info | Cubis Systems
01:56
PRODUCT OVERVIEW | STAKKAbox™ ULTIMA Connect | Access Chamber | Manhole | Cubis Systems
01:00
PRODUCT OVERVIEW | STAKKAbox™ Access Chamber | Manhole | Retrofit Overbuild Solution | Cubis Systems
01:46
PRODUCT OVERVIEW | MULTIduct™ | Cable Protection | Cable Management | Duct System | Cubis Systems
02:20
ORGANISATION OVERVIEW | Cubis Systems FR
02:28
CASE STUDY | Canberra Light Rail Infrastructure Project | STAKKAbox™ ULTIMA Connect | Cubis Systems
03:31
PRODUCT OVERVIEW | PROtrough™ | Cable Protection System | Cable Trough | Trough | Cubis Systems
01:19
ORGANISATION OVERVIEW | Cubis Systems
02:20
HOW TO | Install Radlock Composite Road Plate | Highway System | Cubis Systems
01:29
PRODUCT OVERVIEW | Radlock Composite Road Plate | Highway System | Cubis Systems
01:56
CASE STUDY | Guardian Goal Posts | Overhead Line Warning System | Cubis Systems