Channel Avatar

Meet The Builder @UCqYSswQb40FUiEXmC2WXLvg@youtube.com

1.6K subscribers - no pronouns :c

Learn something different !!!


18:34
METAL SPANDREL | WOOD GRAINS | 178 PASAY
10:49
4TH FLOOR INDOOR INSTALLATION OF TILES | 178 PASAY
08:24
5TH FLOOR TILES SETTING | OUTDOOR BALCONY | 178 PASAY
09:11
CEILING AND WALL PANEL -178 PASAY
10:04
BED FRAME | IRON WORKS | 178 PASAY
17:50
UNBOXING INGCO ROTARY HAMMER DRILL 1800W
16:15
it's all about ceiling | framing | boarding -178 pasay
09:26
DEMOLITION - 184 PASAY
17:23
OCCULAR VISIT WITH SIR ERIC COMIA | PLAN AND BLUEPRINT | 184 PASAY
05:58
DAY 1 TENGCO ST PASAY | MOBILIZATION
09:34
HOUSE RENOVATION - DAPITAN MANILA
12:35
ceiling works- 178 Pasay
12:10
full view concrete finish - 178 Pasay city
03:47
CARPORT TILES SETTING - PACIFIC WOODS IMUS 🌆🏙️
13:09
CONCRETE WORKS - 178 PASAY CITY
11:40
HOUSE RENOVATION- RUBI SAN ANDRES MANILA
16:50
it's All about plastering work - 178 Pasay city
16:50
Pasay 184 | roofing and plastering update
14:21
Pasay 178 | part1 perimeter plaster work
11:20
Pasay 178 | buhos part two | yummy lunch break | 14hrs working
13:52
Week2 Pasay 178 | buhos concrete pouring | magdamagan
06:28
Coco lumber cut size | gusto nyo mura pang porma
12:10
Week1 Pasay 178 l forming works | Paspasan Na!!
09:20
Pacific woods Imus | final clearing | hauling debris etc....
15:23
TIERNEY RESIDENCE | INDUSTRIAL CONTEMPORARY
15:34
Pacific woods Imus | aluminum and glass | electrical | tilings
19:48
Pacific woods Imus | tiles installation | it's all about tiles
18:04
Pacific woods Imus | skimcoat | painting
20:02
Day2 Pasay 178 | Electrical exposed piping layout | fabrication stirups
30:44
Day1 Pasay project | Mr. Mrs sansaet residential | Bakbakan na!!!
31:50
Part3 application of clear gloss | final dress panel door | MTB
31:15
Part2 application of sandling sealer | panel door makeover
09:14
Part1 application of woodstain | panel door makeover
04:17
Builder materials | WILCON PRICE | Ceiling panel
16:51
Pacific woods Imus project | ceiling works ceiling panel | painting
30:26
Imus project | kitchen under cabinet | aluminum cabinet
10:22
Occular visit new project with Atty Xi'an | sir celsio commercial house
07:59
Pacific woods project | roofing extension | 2storey 2bedrooms
14:06
Part 2 kitchen cabinet high pressure laminates | installation of door laminate
15:57
UNICA high pressure laminate | cabinet laminates | built in cabinet
10:02
Built-in cabinet | hang cabinet installation | laminated installation
05:21
Unboxing LOTUS PALM ROUTER | tools review 550watts | cabinet trim router
14:51
New modern house design 2021 | 2 storey with loft | 46sqrm floor area
11:52
Industrial loft house | minimalist house | house blessing | 40sqrm floor area
07:29
Wall finishing | nozzing window and columns retouching
12:17
Electrical wiring | basic wiring residential | termination
01:57
Concrete Plastering PART4 | FINISHING | wall finishing
20:53
Concrete finishing | wall rendering | concrete finish
03:48
CONCRETE PLASTERING PART3 | MEET THE BUILDER | 2storey
15:15
Pacific woods Imus | plastering part3 | extension of garage 2storey
15:15
Pacific wood Imus | plastering part2 | garage extension 2 storey w/ 2 BR
12:24
Pacific woods | plastering | garage extension | 2storey w/ 2bedrooms
10:18
Garage extension | 2storey with bedrooms electrical clearing finish layout
12:02
Garage extension | removing form board | roof beam | chb laying
06:34
CHB laying | running bond method | rebars | garage extension
18:52
Garage extension | 2storey w/2bedrooms | concrete pouring slab |. BUHOs
07:01
Garage extension | 2storey | plumbing pipng layout | water line floor drain| sewer line
23:51
Garage extension | 2storey w/ 2bedrooms | how to install electrical piping layout | lightings C.O.
27:10
Garage extension | 2storey w/ 2bedrooms | structural | forming
11:49
Garage extension | 2storey w/ 2bedrooms | forming works