Channel Avatar

Power System Engineering Solution (PSES) @UCjUfIjRUox5z2OaA7s0j4Cg@youtube.com

2.1K subscribers - no pronouns :c

Power system protection control & Protection relay, equipmen


01:04
REG-D AVR tap changer relay function check
08:47
7UT633 relay communicate with PC #Siemens
04:42
7UT633 transformer protection relay by HMI setting review
07:09
7UT632 Transformer differential relay Power supply issues repair #Siemens
02:14
MVAJ104 Trip relay testing procedure
02:04
MRTP Pilot wire supervision relay #AREVA
01:59
7SJ64 Siemens relay setting review
03:47
REJ525B relay manual configuration
00:43
MGTR GPS connected with Freja 300 #Megger
01:14
Mimic panel for power distribution system
01:43
MDB and EMDB panel
01:21
Control Cable tray installation work
00:41
RED670 relay to Media converter communication failure indication
05:02
Protection panel installation view
01:31
BCU relay installation in LCC panel@ ABB
09:23
GIS 110kV Overviews
01:05
RMU compact substation @ABB
02:33
CT-ERS ABB timer setting
01:37
DCDB/ACDB Panel wiring connections view
02:06
CB Hydraulic pump & Closing Coil and Trip coil view
01:08
DS/ES Motor drive mechanism repair
01:11
CB Hydraulic motor starting current and running current measurement HMB 380kv p_2
01:13
CB Hydraulic motor starting current measurement HMB 380kv GIS p_1
00:48
GIS DIA1 and DIA 2 BUS Join view
00:47
RMU Panel installation
01:05
GIS spare parts
00:26
GIB joint inner view
08:51
GIS Overviews _2 380kv
12:14
GIS CB and DS/ES first operation 380kv @ABB
00:47
GIS CB Contact resistance test 380kv
02:54
Cable insulation resistance test # IR test
03:26
DILO operation explanation
10:42
GIS Contact Resistance test by MOM690 kit 380kv DIA 02 Part-2
12:55
Contact Resistance test by MOM690 Magger #GIS ABB Part-1 DIA 08
06:36
SF6 Dewpoint testing GIS 380kv @ABB
08:09
VT GIS Wiring connection diagram 380kv
08:19
CB trip Circuit block SF6 low stage scheme Circuit wiring check in GIS 380kv
03:17
Annunciator power card problem rectified@EATON#RTK _380KV
02:47
GIS disconnector and Earthswitch motor drive mechanism @ABB 380kv
07:34
GIS HMB timer circuit scheme check 380kv @Hitachi
06:49
GIS Overviews 380kv @ABB
05:14
Distance protection communication scheme check @ RED670
05:32
Distance protection Blocking scheme check @RED670
05:58
RED670 distance protection relay communication, and connectivity package download, installed
00:25
ABB Switchgear installation views
01:43
busbar contact resistance test, cable connection #13.8kv bus
00:56
Earth Switch mechanism repair (3) 13.8kv abb
00:23
Earthswitch mechanism (1) 13.8kv abb
01:34
Transformer winding resistance test -2 #Megger MTO250
01:28
Dry type Transformer vector Dyn11 interviews
01:34
Transformer winding resistance test -1 #Megger MTO250
01:34
GIS Earth switch and Isolator manual close operation
02:50
RET670 harmonics test @ABB# OMICRON 256
18:33
RET670 transformer differential protection relay testing calculations
09:04
VT ratio test 13.8kv by CPC100
10:49
VD4 Circuit breaker timing test 13.8kv #ABB
02:27
VD4 Circuit breaker Insulation resistance test by Megger MTI515#ABB
03:17
Circuit breaker contact resistance test by MOM kit #ABB
06:23
Week end infeed function test distance protection relay @ RED670
10:58
Current sensitivity test & Directional test @ RED670