Channel Avatar

cipi construction @UCh-rGqyQhr_b3wCxi4E8wLQ@youtube.com

24K subscribers - no pronouns :c

This channel uploaded by all about building construction vid


04:08
New fabrication 3 shed work process
04:26
New fabrication work 2
12:13
New fabrication work 1
03:45
New well cutting work | புதிய கிணறு வெட்டும் வேலை | part 2
05:23
New well cutting Excavator work | புதிய கிணறு வெட்டும் வேலை
21:18
New open well work process 120 days
07:40
1050 feet borewell 7.5 hp motor 56 stage taro pumps [full water ]
09:29
New borewell drilling | 75mm water | 130 feet |
07:50
New Terraced floor concrete | full work
06:52
7.5 hp motor 37 stage [ borewell water ] taro pumps
01:43
25 mm rod l bending |cipi construction |
02:01
12 mm Pillar mat l rod making | cipi construction |
05:06
25mm rod in Straight process
07:28
Old pipe using for new centring jack prosses
01:09
Borewell Drilling [300 feet] full water
04:25
500 feet borewell drilling
09:09
borewell drilling
01:59
Simple [column rings] making
09:59
man in fabrication handmade tool
03:02
New Mini lift lifting for materials [m.sand]
25:28
8hp oil engine full restoration process
30:57
New roof reinforcement concrete [beautiful home] 3bhk process
11:10
New concrete work 3bhk house roof
06:00
WoW amazing centring work 3bhk house
05:33
New roof centring sheet installation process
15:27
New roof centring | 3bhk house centring fan intall process
08:34
Board install | shuttering and concrete |
16:13
New staircase | Indoor steps process | 3bhk house
09:04
New 2bhk | building concrete | process
12:28
amazing | brick wall | 3bhk building
12:55
wow! concrete prosses 28×56=1568 sqfeet
08:51
Basement level | [ 22 ] column box | concrete full work process
17:37
Technique | PCC | plain cement concrete | [2600] square feet | full process
01:12
Basement level brickwork | and concrete finished work
18:28
Basement level brickwork process
10:56
Plinth beam bottom | pcc concrete | and brickwork
07:28
column box hole closing | excavator work
11:57
Column box removal | and concrete
12:17
Column box fitting | and concrete work
10:41
RCC column footing concrete work
09:13
column marking | and column fitting work
08:16
PCC concrete footing work
11:38
New site Column marking | and excavator work
05:13
Pillar footing mat making
09:10
Pillar column making | size 1.5×0.75
05:06
Pillar column rod bending work
04:34
New site Pillar column rod cutting work
12:25
How to proper cutting | and welding work
10:25
Brick wall work | 🧱 | new compound
02:41
front compound gate | concrete work
10:42
Pillar concrete work | compound wall |
10:28
Front main gate fitting work | fabrication gate
06:04
Pillar marking work | compound wall
01:19
Reception hall 120×41
01:37
Building demolition work | 4th floor
06:32
Fabrication work | simple design | ms grill | arc welding
05:02
Ston | Granite manufacturing work
02:15
Column footing PCC | cement work process
43:55
wow amazing technique | basement level concrete work | step by step full work
04:11
cooling for concrete | using for water | [ part 4 ]