Channel Avatar

Civil Engineer Institute @UCd9Yzeuvbpxlu7nOYuowQlQ@youtube.com

1.5K subscribers - no pronouns :c

Guys you can get everything about civil engineering on this


10:27
How to Build a Compound Wall (Complete Tutorial)
10:56
Billing Tutorial | Complete Course | Fresher Engineer | CEI
06:49
Labour productivity Chart ЁЯШ▓ | Labour рдХрд╛ Productivity Chart рдХреЛ рдЬрд░реВрд░ рджреЗрдЦреЗрдВ ЁЯФе | CEI
04:01
RCC Hume Pipe рдХреЗрд╕реЗ рдмрдирддрд╛ рд╣реИ Factory рдореЗрдВ | CEI
05:38
Billing Tutorial for Fresher Engineer | Qty рдХреЗрд╕реЗ рдирд┐рдХрд╛рд▓реЗ Excel Sheet рдореЗрдВ | CEI
16:07
Billing For Fresher Engineer | Quantity рдирд┐рдХрд╛рд▓рдирд╛ рд╕реАрдЦреЛрдВ Excel рдореЗрдВ | CEI
15:19
Billing For Fresher Engineer | Procedure of Quantity Estimate | CEI
09:08
Billing For Fresher Engineer | Quantity рдХреЗрд╕реЗ рдирд┐рдХрд╛рд▓рддреЗ рд╣реИрдВ | CEI
06:12
Manufacturing of RCC Manhole Cover in Factory | CEI
06:07
Camber | Camber рдХреНрдпрд╛ рд╣реЛрддрд╛ рд╣реИ Road рдореЗрдВ | CEI
04:05
RCC Column | рдПрдХ RCC Column рдХреА рдХрд┐рддрдиреА рдХреАрдордд рд╣реЛрддреА рд╣реИ | CEI
05:27
BoQ Items | Four Types Items in Civil BoQ | Billing Engineer | CEI
07:39
Quiz Test | Sunday Special Test for Civil Engineer | CEI
05:21
Joint Measurement Report | J.M.R рдХреЗрд╕реЗ рдмрдирд╛рддреЗ рд╣реИрдВ Site рдкреЗ | CEI
05:48
Billing | Covering Letter рдХреЗрд╕реЗ рддреИрдпрд╛рд░ рдХрд░реЗрдВ | Part - 5 | CEI
10:11
Major Accident At Construction Site ЁЯШЮ| CEI
11:19
Billing | Tax Invoice | Tax Invoice Sheet рдХреЗрд╕реЗ рдмрдирд╛рддреЗ рд╣реИрдВ | CEI
06:24
Billing | Abstract Sheet рдХреЗрд╕реЗ рдмрдирд╛рддреЗ рд╣реИрдВ | Billing рдХрд░рдиреЗ рдХрд╛ рд╕рд╣реА рддрд░реАрдХрд╛ | CEI
09:14
Billing | MB Kese banate hain | Billing ka sahi tarikat | Part-2 | CEI
02:21
Area of One Toilet | рдПрдХ Toilet рдХреЗ рд▓рд┐рдП рдХрд┐рддрдирд╛ area рд╣реЛрддрд╛ рд╣реИ | CEI
04:56
Slope in Toilet | Toilet рдореЗрдВ рдХрд┐рддрдирд╛ Slope рд╣реЛрдирд╛ рдЪрд╛рд╣рд┐рдП | CEI
03:53
Wooden Finishing Work | Labour Productivity | Construction Office Cost | CEI
06:28
GSB | Labour Productivity | 1 Cum Cost of GSB | CEI
06:04
Granite | Labour Productivity | Labour Coefficient | 1Sqm Cost of Granite | CEI
04:34
ATT | Labour Productivity| Labour Coefficient | 1Sqm Cost | CEI
04:09
Labour Productivity | 1 Sqm Cost of Tiling Work | Labour Coefficient | CEI
05:07
Labour Productivity | 1Sqm Painting Cost | Labour Coefficient | CEI
06:08
Labour Productivity | 25mm Thk. IPS Flooring Cost | Labour Coefficient | CEI
06:05
Labour Productivity | Labour Coefficient | 1 Sqm Cost of plaster Work| CEI
04:35
Labour Productivity | Labour Coefficient | Labour Cost | CEI
06:02
Labour Productivity | 115mm Brick Masonry Cost | CEI
05:54
Labour Productivity| Masonry Work | CEI
06:12
Labour Productivity | Ek Kg Fabrication Work me Kitni Labour Lagti Hai | CEI
05:50
Labour Productivity | 100 Kg Steel ko bandhne me kitni Labour Lagti Hai | CEI
06:42
Labour Productivity | Labour Coefficient | Labour Cost | CEI
00:27
RCC Padestal Size #shorts #shortvideo #youtubeshorts
09:07
Labour Productivity| Ek Cum RCC M25 ko Casting karne me kitni Labour Lagti Hai | CEI
05:28
Minimum & Maximum Distance Between Two RCC Columns? | Minimum Spacing between two Columns
07:53
H.I Method | R.L Kese Nikalte Hai | Reduce Level | CEI
04:48
Labour Productivity | 1 Cum Cost of PCC M10 | CEI
00:23
Building Layout | CEI
00:23
Information About Building Layout | CEI
04:19
RCC Pedestal | Size and Depth of RCC Pedestal || CEI
07:03
Column Reinforcement Checking | Column ki Steel kese check karte hai | CEI
08:13
Rate Analyses | Excavation Rate Analyses | Excavation | CEI
08:01
Billing | Billing Introduction | Billing Parameters | CEI
06:56
Column Layout | Column & Footing Layout | Column | CEI
34:27
MS Project | Building Planning on MS Project | CEI
07:28
Moisture Content | Water Content | Lab Soil Test | CEI
05:12
Footing Layout | Building Layout | Building ka Layout kese karte hai | CEI
00:20
Skirting kese lagaye #shorts #shortvideo #youtubeshorts
01:08
RCC Slab Cost | RCC Slab Construction | 900 Sft Area | CEI
00:28
Slope in Roof | Roof Water Drain Out | CEI
06:55
Backfilling | Labour Productivity Calculation Formula and Output for Construction Works | CEI
07:32
Brick Cone Chamber | Cost of Chamber | Costing | CEI
03:24
Water Stopper | Use of Water Stopper | Use in RCC Structure|| CEI
11:34
Excavation | Labour Productivity Calculation Formula and Output for Construction Works | CEI
08:58
How to calculate cement sand and aggregate quantity in concrete | CEI
07:07
IS CODE 456:2000 | Plain and Reinforced Concrete | CEI
06:22
Contour Level | Contour Drawing | Contour Line | CEI