Channel Avatar

Dan Gorman @UCYNyKuo2WH_GuM8GQCFm3lA@youtube.com

735 subscribers - no pronouns :c

More from this channel (soon)


02:30
swri coil 6
02:02
Craig 900P
00:44
Gorman Machine Corp Delrin Core Rotator Shafts
01:13
Full Circle winding
01:27
Coil 3
01:36
Speedometer Cable Rust
04:00
Third attempt
04:53
Third attempt
01:02
The CHUTE MASTER Hydraulic Chute Rotator for John Deere 47" and 54" Snowblowers.
06:23
Test 6
03:21
Productor II winding 250 turns of 23 AWG wire.
04:33
Test 4
03:46
Gorman Machine Corp Custom HDH
01:06
43 turns of wire
01:56
1110 turns of 24 AWG wire.
02:19
130 turns of 36 AWG wire.
00:57
Gorman Machine Corp Productor II Toroid Winder
01:27
Gorman Hustler Hook Winder
04:06
Gorman Machine Hustler Hook Winder
16:53
Second tall coil attempt
02:41
First tall coil attempt
01:14
2+2 Position 4
01:28
2+2 Position 3
01:06
2+2 Position 2
01:04
2+2 Position 1
02:36
Gorman Machine 2+2
02:38
Gorman Machine 2+2
00:54
1275 turns of 26 AWG
04:10
Huslter Hook Winder
02:36
Hustler Hook Winder
02:50
Hustler Hook Winder
06:04
Two windings of 24 AWG wire at 19 turns each on Huster hook winder
03:19
Two pairs of windings using Hustler Hook Winder
06:59
920B Toroid winder
00:53
Toroid winding sample
02:33
Hustler hook winder winding 18 turns of 13 AWG wire
03:13
Hustler winding 12 turns of 11 AWG wire
01:13
New Gorman Machine Super 900 Toroid Winder
01:10
New Gorman Machine Super 900 CNC Toroid Winder
01:20
New Gorman Machine Super 900 CNC toroid Winder
01:21
New Gorman Machine Super 900 CNC Toroid Winder
01:24
Pancake tensioner assembly
00:43
2+2 with clutches
02:12
Flat wire being wound on cylinder
00:53
Hustler 3 roller attempt
02:03
Hustler hook winder
01:32
Hustler Hook Winder
03:27
Winding 80 turns on 3 layers first attempt.
04:47
Hustler 4x4 Hook Winder Basic Instructions
01:54
super 900 2
03:39
super 900
01:26
Used Productor
02:08
multiproducts
00:35
Spin Winder Repair
00:57
Gorman Machine 6 Inch Head
00:27
High Roller position
00:17
Low Roller position
04:11
1,125 turns of 24.5 AWG
02:47
Installing the Shuttle Release Lever components on the Gorman Machine 6" Winding Head.
01:13
Proper opening of the shuttle on a Gorman Toroid Winder.