Channel Avatar

Technical Biswajit @UCY8skLTe0hTOQte03q3S6LA@youtube.com

931 subscribers - no pronouns :c

More from this channel (soon)


06:07
Erection of PCC pole 9 mtr long//11 KV over head line construction
03:17
11 KV over head line construction
06:51
Low tension ab cable power fault diagnosis and rectification work
04:07
নিরবিচ্ছিন্ন বিদ্যুৎ ব্যবস্থার জন্য গাছ কাটা//Tree🌳 cutting🌲 for🌳 Uninterrupted🌳power🌲supply 🌳🌲🌳🌲🌳🌲🌳
01:35
Electrical iron accessories fabrication work
03:42
LT ab cable power fault solution
03:38
63 KVA Dtr sub station isolator problem solution
04:16
Dtr power connector fault diagnosis and rectification work
06:13
100 KVA Dtr power fault solution
05:02
Domestic power problem solution
06:51
25 KVA Dtr sub station power problem solution
29:46
LT Power supply network maintenance by LT mobile van
25:07
L & MV distribution network power problem diagnosis and rectification work by LT mobile van
04:42
LT power fault diagnosis and rectification
03:23
Low voltage problem solution
05:18
11 KV over head line//Tree🌳🌲 cutting🌳🌲 work🌳
05:04
Dtr power fault diagnosis and rectification work
04:15
High tension line//Tree🌳 cutting🌲 work🌳
03:13
Service connection / power cable / fault diagnosis and rectification work
03:04
Tree🌲 trimming🌲//Tree🌳 cutting🌳//Uninterrupted power supply
04:57
Double pole new dtr sub station structure fittings
06:51
Low tension power fault rectification work
03:03
Fittings double pole structure for high tension electric line
03:19
বিদ্যুৎ সুরক্ষায় গাছ কাটা//🌳Tree🌳 cutting//Tree🌲trimming🌲//Safety of electricity🌳
23:32
LT network power fault diagnosis and rectification work
04:40
11 KV over head line cradle guard work
05:51
LT distribution box power fault diagnosis and rectification work
05:32
33/11 KV line tree🌳cutting🌲work🌳
05:11
Tree🌳🌲 cutting🌳//safety//electricity//smooth power
03:17
Cradle guard work for safety of electricity
03:13
11 KV line cradle guard work🌳
05:45
Drawl of C. G
03:49
11,000 ভোল্ট বিদ্যুৎ লাইনের সুরক্ষায় গাছ কাটা//Tree🌳cutting🌲//safety//electricity🌳
21:37
Low tension power fault diagnosis and rectification work by LT mobile van
22:07
Electric power restoration//fault diagnosis and rectification work by LT mobile van
24:45
L&MV distribution network fault diagnosis and rectification work by LT mobile van
35:33
LT power restoration by mobile van//fault diagnosis and rectification work
19:57
11 KV High tension network fault diagnosis and rectification work by HT mobile van
25:18
LT distribution network fault diagnosis and rectification work by LT mobile van
15:43
High tension power restoration by HT mobile van
03:30
Tree🌳 cutting🌳 for electricity🌳
03:13
Fixing of C. G
04:16
LT service cable change
05:04
LT ab cable neutral connector failure//fault diagnosis and rectification work
06:51
Installation of new 63 KVA Distribution transformer
04:25
LT AB cable fault diagnosis and rectification work
05:26
25 KVA Dtr shifting and lifting on sub station structure
06:06
Electric pole electrified // Fault diagnosis and rectification work
04:44
11 KV over head line tree🌲cutting🌳work
12:05
25 KVA DTR Power Charging
03:20
33/11 kv line tree🌳 cutting work
04:29
Installation of extension upto 3 mtr length on pcc pole
03:36
11 KV over head line tit bit tree🌳 cutting work
11:36
11 KV HTOH Line construction // Extension pcc pole
05:03
L&MV line maintenance work
01:01:14
LT distribution network maintenance by Electrical mobile Van
06:51
LTOH line power fault
04:53
Erection of pcc pole 9mtr for span adjustment of 33 KV over head line
04:40
Tree🌳 cutting for uninterrupted power supply
03:20
Fixing of cradle guard for 11 kv high tension over head line // electrical installation // C. G