Civil engineers create, improve and protect the environment


Welcoem to posts!!

in the future - u will be able to do some more stuff here,,,!! like pat catgirl- i mean um yeah... for now u can only see others's posts :c

Civil Positive
Posted 1 year ago

A huge milestone achieved on the day of republic day by erection first U Girder Span P103 - P104 (Near Bhootnath Station ) in PC01-PATNA METRO PROJECT
#Patnametro
#PC_01-PATNAMETROPROJECT

5 - 0

Civil Positive
Posted 1 year ago

Today India celebrates #राष्ट्रीयएकतादिवस
#NationalUnityDay on the eve of birth anniversary of late Bharat Ratna #SardarVallabhbhaiPatel #सरदार_वल्लभभाई_पटेल Naman to iron man of India

5 - 0

Civil Positive
Posted 2 years ago

Under Construction:
Title : Construction of new 4 Lane Signature bridge with 900m long central cable stayed module connecting Okha and Beyt Dwarka including construction of approaches on new national highway no NH-51 in the state of Gujrat

Associated Client : MORTH

Location : Gujrat, India

Salient Features:
Total Length: 2452m
Cable Stay Span: 900m
Approach Span: 1420m (26x50m + 12x10m)
Retaining Walls: 3483m

15 - 2

Civil Positive
Posted 2 years ago

Tomorrow upload Deck Installation procedure Video

3 - 0

Civil Positive
Posted 2 years ago

Auto Level

6 - 0

Civil Positive
Posted 2 years ago

꧁𝒬☞︎︎︎♔︎♔︎♔︎☜︎︎︎𝒬꧂
*𝐇𝐀𝐏𝐏𝐘 𝐇𝐎𝐋𝐈*

*आपको और आपके परिवार को होली के पावन अवसर पर मेरे और मेरे परिवार की तरफ से, हार्दिक शुभकामनाये!* ☜︎︎︎𝒬꧂
꧁𝒬☞︎︎︎ होली के रंगो की तरह *आपकी जिंदगी भी, खुशियों के रंगो से भरी हो,मेरी यही कामना है.*...
꧁𝒬☞︎︎︎ _*HAPPY HOLI*_ ☜︎︎︎𝒬꧂

2 - 0

Civil Positive
Posted 2 years ago

Signature Bridge- Top View

Video - Coming Soon


Construction of new 4 Lane Signature bridge with 900m long central cable stayed module connecting Okha and Beyt Dwarka including construction of approaches on new national highway no NH-51 in the state of Gujrat

Associated Client : MORTH

Location : Gujrat, India

Salient Features:
Total Length: 2452m
Cable Stay Span: 900m
Approach Span: 1420m (26x50m + 12x10m)
Retaining Walls: 3483m

2 - 0

Civil Positive
Posted 3 years ago

Height of Parapet wall should be = 1m
Thickness of DPC = 2.5cm OR 1 inch
Height of Building = 3.15m
Height of Window = 2.1m
One bag of cement = 1.25cubic feet and 0.0347 m3
Weight of one cement bag = 50kg
Minimum thickness of slab = 125mm
No.of cement bags in 1m3 = 28.8bags
Lintel thickness = 15cm (min)
Lintel is provided at = 2.4 m in case of brick wall
Minimum diameter of bars used in slab = 8mm
Minimum diameter of bars used in column = 12mm
Minimum diameter of bars in Dowel bars = 12mm
Maximum diameter of bars in slab = 1/8 x thickness of slab
Maximum chair spacing = 1m
Dimensional tolerance of cube = +2mm -2mm
Maximum water absorption should not be more than 20%
Initial setting time of cement = 30 minutes
Final setting time of cement = 10 hrs 600 minutes
DPR = Detailed project report

Unit Weight👇
RCC = 25 kN/m3 = 25000N/m3
PCC = 24 kN/m3= 24000 N/m3
Steel = 7850 kg/m3
1 Gallon = 3.78 liters

Minimum no of bars👇
For square column or rectangular = 4 bars
For circular column = 6 bars
1 Yard = 3 feet
Weight of steel = D2/162.2 kg/m
Weight of steel = D2/533 kg / ft
Slope of staircase = 25degree to 40 degree
Size of concrete testing cube = 150x150x150 mm
Concrete cube is filled in =3 layers
Slump cone is filled in = 4 layers
Cement should be used within three months of manufacturing.
Minimum thickness of shear wall = 150mm
Maximum thickness of shear wall = 400mm
Universal testing machine is used for compression test of concrete tensile test of steel reinforcement.
Minimum curing period
7 Days Normal weather condition
10 Days not weather condition
Minimum percentage of steel column = 0.8 % of cross area
Max % of steel in column = 6% of gross area

Nominal Cover👇
Footing = 50mm
Column = 40mm
Slab = 20mm
Beam = 25mm

Lapping is not allowed in bars of diameter 36mm or more welding is preffesed.{Old}
Lapping of bar is not allowed for dia> 32mm as per new amendment

No.of stirrups in beam = clear span/c/c/ spacing + 1
R.C.C is affected by water because of corrossion of reinforcement bars.
P.C.C is not affected by the water.
Join📚Share📚Helpful

15 - 0