Channel Avatar

Andrew Millward Watford @UCVzK1X5Bl5e6J20UhlbX7PQ@youtube.com

3.6K subscribers - no pronouns :c

Heating, wood work and my other interests. My face book link


04:33
More on esbe mixing valves
05:14
Using the esbe app to select an appropriate mixing valve for a variable temperature heating circuit.
11:16
Sizing low loss headers and distribution headers.
01:06
Rotheberger pipe bending machine
02:51
Positioning the shoe in an esbe mixing valve
03:35
Esbe valves and valve authority.
02:56
Heat geek cylinder. If Carlsburg did cylinders...
03:56
A little more on mixing valve authority.
02:14
Viessmann 222
02:05
A new shower room
02:57
Separating two boilers to provide weather compensation on two separate curves with no mixing
05:03
another project with boiler Trust
01:20
Reinstalling a poorly fitted heat pump
02:12
plant room upgrade
03:33
Another oversized and poorly designed commercial system
02:50
Vailant heat pump instalation for Heat Geek.
00:32
stacking rubber lined clips
02:01
Levelling up a heat pump with shims and checking for chassis Twist with winding sticks
07:05
Weather compensation ratios
13:03
Heat pumps, buffers and variable temperature mixers.
04:18
Viessmann 151a heat pump.
03:03
Flat-faced unions. making a water tight joint the correct way
05:04
Daikin heat pump poor system design.
09:57
Do we need buffers or hydraulic separation with heat pumps?
02:25
more on those heat pumps
03:32
Sorting out the poor heatpump instalations.
06:24
heat pump problems being rectified
11:43
My biggest Project so far
03:05
under floor heating with weather compensation.
01:19
64kw to one hot water cylinder. Viessmann make the best kit!
06:27
Preston plant room (Garage)
00:48
Domestic hot water priority System
01:51
Vaillant ecofit pure incorrectly installed upgraded with weather compensation hydraulic separation
01:01
A pair of Viessmann boilers.
04:23
Vitodens 200 control
02:00
Insulation by Maili
03:56
My latest installation. Viessmann 200 with two esbe mixers.
04:16
Two boiler and three circuits. Queen vic would be proud
05:07
Some tips
03:30
Finished job at the Thai embassy.
03:12
A new Viessmann boiler for Thailands London embassy.
02:23
One floor of ufh laid.
03:48
Small mixed circuits on Esbe mixers with one plate separated circuit.
04:27
Completed alterations to ecodans / mixergy instalation.
04:28
Poor work and poor performance from a heat pump instalation.
09:04
Unmixed circuits can be a design failure.
04:31
Plate heat exchanger linked.
00:13
My van damaged by a poor driver.
09:45
A tour of my Estonian house
00:42
Don't need to screw Viessmann flues
02:17
One of my Soviet flats in Tallinn
02:55
Years of poor gas heating design and now its heat pumps being poorly i stalled.
01:07
Plate seperation for ongoing boiler protection.
04:02
Where do you inject your chemical treatments ?
02:14
Another project as good as finished.
02:26
ufh so pften poorly installed
02:28
Pipe heat losses on a single circuit.
03:44
Joule cylinder
02:25
Wojciech Sulinski and his brother Krzysztof have created a perfect system.
02:02
More mixing valves, low loss header and a plate heat exchanger.