Channel Avatar

Cam at Battler @UCOeWaRrLH1hNB7VqzA8OGRQ@youtube.com

5.8K subscribers - no pronouns :c

Welcome to my Channel with lots of happenings around my litt


21:01
Victor Lathe new Pulley and Brake Drum Fit-up
22:25
Fly Cutter Build Part 2
21:37
Fly Cutter Build Part 1
04:20
Coffee Cup Stirling Engine
18:14
Victor Lathe Drum Brake
09:28
Victor Lathe Motor Base Rework
06:52
The Simplest Hot Wire Foam Cutter Build Ever
11:51
Shock and Awe on the Victor Lathe
09:36
Making Thin Shim Stock
20:36
Small workshop jobs and a new machine build
08:02
Epoxy Resin Machining
05:42
Indian Bike Seat Plug Machining and Finishing
18:54
A call to help out a fellow You-Tuber. Lets make up some simple Tool Box Draw Dividers.
28:47
Furnace Rebuild Part 1.
38:29
Victor Lathe Tool Post Fitment Part 2
16:58
Victor Lathe Tool Post Fitment Part 1
09:07
Foundry Shed Build Update Part 2
11:49
Chamfer Tool for the survey "L Bracket" and a quick look at the progress on the Foundry Shed.
03:02
5000 Subscription Give Away Draw
04:21
5000 Subscription Thank You and Give Away
24:57
Isuzu DMax Ute Bull Bar Rack in Stainless Steel
21:08
John Ram and his models featuring the Snow
19:23
1917 Indian Chief Motorcycle Seat Mould Machining
19:57
Colchester Lathe Clutch Plate Part 2
27:37
Colchester Lathe Clutch Plate Part 1
01:00
1917 Indian Chief Motorcycle Seat Scan
14:30
Heidi Steam Locomotive Boiler Fabrication
09:56
Sad News, Indian Motorcycle Seat, More Foundation Work, More Boiler Work
21:16
6" Offset Irwin Vice Nut and Screw Manufacture
26:12
Making Adjusting Feet for the Victor Lathe
04:52
Slotting Attachment for the Bridgeport Mill
02:36
Victor Lathe Spindle Speed Using the 8 Pole Motor Configuration
18:24
Making a 127 tooth Change Gear for the Victor Lathe Part 2
18:31
Making a 127 tooth Change Gear for the Victor Lathe Part 1
01:13
60 Second Sunday, Slotting
27:08
Victor Lathe Change Gear Manufacture using my Electronic Dividing Head.
12:51
Victor Lathe Power Track / Drag Chain Installation
18:36
DRO Armour Cable Repair
14:35
Sino DRO Diameter and Radius set up
15:36
Fitting DRO Scales to the Victor Lathe Part 3
16:51
Fitting DRO Scales to the Victor Lathe Part 2
17:01
Fitting DRO Scales to the Victor Lathe Part 1
14:27
240V Single Phase to 415V 3 Phase Inverter, YouTube Policy Change, Finally Running the Victor Lathe.
15:03
Boiler Stay Machining for the Ransomes Sims & Jefferies
09:39
Making and fitting Felt Oil Wicks to the Victor Lathe Apron.
08:18
Victor Lathe Oil Drain Plug fabrication and we try some chemical bluing on the finished plug.
20:28
Stickers, Victor Lathe, Ebay Winge, Crazy Prices for Machinery and a Request for Information,
17:09
Ransomes Sims and Jeffories Stationary Engine Regulator Mounting
16:00
Ransomes Sims and Jeffories Stationary Engine Cylinder Mounting
13:56
Engine Hoist Fail and Rebuild Part 2 and Finally Some Stickers
26:56
Engine Hoist/Crane Fail and Repair Part 1
25:48
How to Mull Green Sand without a Muller
09:34
Why my absence from YouTube
30:59
Veranda Hand Rail Post Repair, joining end grain with Titebond 111.
34:16
Machining the Throat Plate and Back Head in Duplex 2205 S/Steel
19:35
Portable Jib Crane for the workshop. Part 3, finish machining the Patterns and Core Boxes.
13:15
Portable Jib Crane for the workshop Part 2. Making the Patterns
26:07
Machining up some more of the Boiler components in the Duplex 2205 S/Steel
15:25
Cutting a Large Diameter Radius for a Boiler Mount Plate
23:42
Portable Jib Crane for the Workshop