Channel Avatar

Just Living With George And Woon @UCOKPmn23tcmld5FVsQl9Phw@youtube.com

3.5K subscribers

Welcome to our channel, Just Living With George And Woon. We


31:40
Continue To Assembling And Fitting The Stainless Steel Shower In The Bus
31:21
Assembling And Fitting The Stainless Steel Shower In The Bus
08:41
Continue To Work On The Walls
05:44
Working On The Last Part Of The Floor
11:17
One Of The Mini Split Units Is Up And Running
10:17
Putting Televator Together
06:20
A Little Update On Several Projects In The Bus
06:00
Installing Ceiling Wood Slats
13:29
The Beginning Of Installing A Water Manifold
07:28
The Start Of Electrical Wiring
05:23
Working On The Floor And Walls
14:32
Modifying The Bedroom Cabinets
06:13
Hooking Up The Electric On The Water Heater...What Did I learn
14:04
Second Wall Going Up In The Bus
09:07
Solar Panel System Finally Fully Installed And Running
15:05
First Wall In The Bus
14:46
Installing Plywood On The Walls
06:40
The Second Array Of Five Solar Panels
08:07
Insulating The Bus Entrance Door
06:53
Installing The First Array Of Five Solar Panels On The Bus
04:34
The Start Of Installing Second Layer Of Plywood To The Floor
04:51
Spraying The Interior Floor With Ceramic Insulation
15:33
The Solution For The Solar Panel Rack
03:51
Insulating The Water Tank Compartment
08:23
Mini Split Copper Line Install
34:59
installing The Ceiling Foam Insulation
20:37
Where We Stand Now Moving On To The Inside
04:50
Checking The Bus Roof For Leaks
29:55
Finally Applying The Ceramic Insulattion Then The Unexpected Happened
08:07
Removing The Rub Rail On The Bus Door
07:49
Cutting The Ends On The Wind Deflector And Applying Fiberglass
10:57
Applying Fiber Glass On The Emergency Hatch Seams
06:59
Permanently Sealing The Deleted Windows And Prepping For Primer
04:54
Replacing The Windshield Spray Nozzle
04:42
Installing The Hydronic Heater Mount
19:28
Priming The Bus
08:09
Installing The Front Wind Deflector
04:18
More Prep For Priming
03:07
Hydronic Heater Mount Finished
15:54
Sanding And Preparing The Roof For Primer
11:54
Finishing And Installing The Other End Of The Rear Radiator Door
20:01
Mixing And Applying Two Coats Of Epoxy Primer To solar Rack And Wind Deflector
05:06
PreppingThe Wind Deflector And Solar Rack For Primer
08:40
Working On The Wind Deflector Finally
16:06
Working On The Rear Radiator Door
09:55
Preparing To Mount The Solar Panels...Problems?
12:35
Finishing Up The Frame For The Propane Tank
17:14
Heading Back To Texas
30:29
Small Trip Down Memory Lane
06:34
Badlands National Park
09:10
Mount Rushmore National Park
06:36
How To Resister Your vehicles In South Dakota 2025 Part 3
06:31
How to Get Your South Dakota Drivers License 2025 Part 2
12:06
How To Establish A South Dakota Domicile 2025 Part 1
12:10
South Dakota Trip
06:57
Cutting And Welding The Propane Frame
13:29
Replacing The Fast Idle Safety Switch And The Parking Brake Switch
17:23
So What Now With The Solar Rack This is What We are Going To Do
16:28
A Little Bit Of Family Time
05:08
Final Welding On The Solar Rack Finished