Channel Avatar

Renovacile @UCNDzVlpGQlw3WiS0DGWfs1Q@youtube.com

77K subscribers - no pronouns :c

Nous sommes Alex et Ophélie, et te souhaitons la bienvenue !


21:26
We’re Installing a 9m² SUSPENDED NET in Our House 🔥 (giant relaxation net) – EP95Description:
28:25
WE'RE TRANSFORMING THE UPPER FLOOR! Railing, hammock net and herringbone flooring – EP94
20:18
PLASTERBOARD ARCH: Creation and Final Result (It's Crazy!) - EP93
22:05
CONSTRUCTION of our KITCHEN: a future dream kitchen under renovation - EP92
18:44
WE ARE BUILDING our TECHNICAL ROOM: electricity, plumbing and double flow CMV - EP91
21:14
CREATION of GLASS ROOMS: all the SECRETS REVEALED for success (crazy result!) - EP90
14:52
PROFITABLE: STORING your SOLAR ENERGY in a battery? Testing the Zendure Hyper 2000
21:22
NEW ROOMS and DOORS (the change is incredible!) - EP89 - house renovation
24:36
STONE WALL OPENING in the house - EP89
18:51
ROOF LEAK and wood cladding completed - EP87
23:14
THE CEILING of the extension: structure and insulation - EP86
19:56
CONSTRUCTION OF THE LIVING ROOM: 30 hours to insulate and install plasterboard - EP85
20:30
TIMELAPSE RÉNOVATION SALLE DE BAIN 100% terminée ! - maison rénovation
13:32
INDUSTRIAL BATHROOM (the details that change everything!) - EP84 - home renovation
24:32
BARN WALL RENOVATION 100% Complete (The result is amazing!) - EP83
19:03
RENOVATION of a retaining wall with lime - EP82 - house renovation
20:34
BATHROOM almost finished? (the result is magnificent!) - EP81
24:29
THE INDUSTRIAL SHOWER is finished! All the steps - EP80
31:53
TIMELAPSE RENOVATION 3 YEARS BARN HOUSE IN 30 MINUTES
20:40
BARN FRONT finished! Lime and sand grouting - EP79
16:36
WASHING WC of the future Japanese toilet in the bathroom - EP78 - home renovation
19:30
DOUBLE FLOW VMC hot/cold and bathroom construction - EP77
23:13
Complete exterior WOOD CLADDING in 1 week - EP76
20:52
THE BEDROOM: XXL partition 5 meters high - EP75 - house renovation
20:55
COMPLETED INTEGRATED LED WALL: Steps from A to Z in DIY - EP74 - DIY renovation tutorial
20:00
LIME JOINTS how much does it cost? 🤑💲 - EP73 - jointing renovation
21:30
Roller paint & LED strip wall finishes - EP72 - renovation
13:57
Raking and sanding the XXL CEILING: ready to paint - EP71 - abandoned house
17:37
Airless paint gun: the dressing room is finished ✅ - EP70 - DIY renovation
22:34
CATHEDRAL CEILING strips and sanding - EP69 - home renovation
24:52
LED WALL and dressing room finishes - EP68 - home renovation
20:33
WE CHANGE EVERYTHING! Joint strips, raking and sanding of coated walls - EP67
25:58
TIMELAPSE 2024 before/after house renovation 2023 RETROSPECTIVE of the work
21:07
Plasterboard STRIPS and RACKING of the wall - EP66 - barn renovation in house
20:03
LIME FACADE and creation of plasterboard niches - EP65 - house renovation
22:29
FINALLY INSTALLED metal & wood STAIRS and LED profiles integrated into the wall - EP64
17:49
WE ATTACK the GROUND FLOOR - laying plasterboard in the barn - EP63
18:36
25 TONS of stones in the WHEELBARROW! It's hard ! - EP62
22:04
GABLE INSULATION completed! - EP61 - house renovation
27:44
TIMELAPSE 2 YEARS OF RENOVATION OF A BARN AT OUR RESIDENTIAL HOUSE
19:08
WE START THE TERRACE and prepare the staircase - EP60 - house construction
20:26
EARTHWORK of the garden and SLABS on the entrance of the house - EP59 - barn renovation
19:25
WE PLACE THE PLASTERBOARDS on the walls - EP58 - placo platre
19:25
CONCRETE SLABS IN THE ALLEY OF OUR BARN - EP57 - house renovation
33:19
FACADE OF THE BARN COMPLETED and we put the first plasterboard - EP56 - Renovation house
23:44
THE GARAGE IS FINISHED: whitewashed walls - EP55 - Barn renovation
22:29
ON INSULATION 240 and VAPOR BARRIER - EP54 - Home renovation
23:44
WE BEGIN THE INSULATION of the mezzanine, FINALLY! - EP53
24:09
JOINTING of the GARAGE and VMC double flow - EP52
25:24
STOVE PIPE: Laying ✅ - EP51 - Home renovation
23:17
WE PLACE THE PERIMETER DRAIN around the barn - EP50
17:51
SPACERS and FLOOR CONSTRUCTION - EP49 - renovation of our house
20:59
ON INSTALLING THE JOINERY - EP48 - barn renovation
28:43
OSB FLOOR LAYING on mezzanines - EP47 - house construction
19:58
MEZZANINE CONSTRUCTION and installation of extension windows - EP46 - barn renovation
21:57
FINISHED STONE WALL and installation of IPE - EP45 - barn renovation
21:14
BEFORE / AFTER - The windows are installed - EP44 - renovation timelapse before after
22:39
THE ROOF is FINALLY placed on the extension and the garage - EP43 - house renovation
30:19
THE FAQ of our barn renovation - EP42 - house renovation
21:38
STONE WALL and MEZZANINE - EP41 - barn renovation