Channel Avatar

Electrical Academy @UC9llXQLBOODt8OSiJG2bM4g@youtube.com

278 subscribers - no pronouns :c

A good forum for learning the all electrical aspects of cons


02:04
RMU Relay | Overcurrent/Earth fault Relay | HCC412U Digital Management Unit | ABB Tester SVERKER 760
01:05
Energy Meter | Backup Energy Meter | 132KV Energy Meter Overview | ISKRA | Energy Meter
00:37
IR Test | KYORITSU | KEW 3125A | Power Transformer Testing | Bushing Testing | 132KV Bushing Testing
01:15
OTDR Test | FO Cable Test | Fiber Loss | Optical Time Domain Reflectometer | OTDR | JDSU MTS-6000 |
01:26
SVC Busbar AC HIPOT | MSVC | 33KV | 20MVAR | MCR HIPOT | Shandong Taikai Power | Huazheng |
01:15
MV Busbar HIPOT Test | AC HIPOT Test of 33KV MV Busbar | AC HIPOT | Huazheng | Medium voltage HIPOT
00:32
Power Grid Overview with Solar Plant | 132KV Grid Overview | Solar Power | 132KV Substation | 132KV
01:06
AC HIPOT 132KV Grid | 132KV Busbar HIPOT | Huazheng | AC HIPOT 145KV | 132KV Grid |
01:02
DC HIPOT Test | Power Cable HIPOT Test | Huazheng | HZZGF-120kV/5mA | MV Cable | Power Transformer |
00:45
IR Test for LV Busbar | LV Busbar Test | IR Test | KYORITSU KEW 3127 | High Voltage Insulation Test
00:40
Earthing Resistance Test | Mesh Resistance Test | 132KV AIS Earthing Resistance Test | DUOYI DY4100
00:36
CT Primary Injection Test | 132KV CT | Primary Injection Test | Megger | CSU600AT | Testing |
01:32
FO Cable Joint | Fiber Optical Cable Joint | Fiber Splicing | HS ETFIBER | FO Joint | Cable Joint |
01:05
Transformer Differential Protection Testing | 132KV Power Transformer Testing | Omicron CMC 365 |
01:05
DC Combiner Box | DCB | String Box | PV Combiner Box | Longmax | Bevone | Solar Combiner Box | PV |
00:59
33KV MV Room Overview | Draw out CB Trolley | Opening CB | Siemens | EATON | Cooper | ABB |
01:23
33KV Circuit Breaker Testing | Open Close | Bounce Back | Un synchronism | MV CB Testing | Megger |
01:16
33KV Contact Resistance Testing | MV Switchgear Contact Resistance Test | Huazheng HZ-5100 | Testing
01:44
132KV Cable Trench | AIS Yard Cable Trench | Cable Trench Overview | Power Transformer MSVC BAY |
01:01
Surge Arrester IR Testing | Insulation Resistance | ABB Xiamen Surge Arrester | KYORITSU KEW 3127
01:24
NGR | Neutral Grounding Resistor | Power Transformer Protection | Baoding Tianwei Hengtong THT-DKSC
00:44
33KV | MV Switchgear Trench | Under construction Medium Voltage Trench | Cooper | EATON | ANSI 40.5
01:11
48 DC | Battery Charging Test | Floating Mode | Equalizer Mode | 10 Hour Charging | Zhonhen | Haze |
01:05
110 DC Battery Charging Test | Floating Mode | Equalizing Mode | 10 Hour Charging | Zhonhen | Haze
00:38
48 DC Battery Discharging Testing | Battery Bank Discharging Test Megger Torkel HAZE Battery 10 Hour
00:49
CT Testing | 33KV CT Testing | MV Switchgear CT Testing | Ponovo Analyzer | CT PT Analyzer
00:57
110 DC Battery Discharging Testing | Battery Discharging Test | Megger Torkel | HAZE Battery 10Hour
00:17
132KV Grid Station Construction 132KV Under Construction 132KV AIS Solar Wind#ZeroCarbon#GreenEnergy
02:51
EDG Placement | Solar Power Plant | Wind Power Plant | EPC | EDG Install Grid station | 132KV Grid
02:07
Cable Trench Construction MV LV Cable 33KV System Cable Trench Underground System Cable laying
00:33
Quadcopter Takeoff Landing Student level University Feasibility DC Motor Final year Project Arduino