Channel Avatar

ECOTIRTAN INDONESIA @UC66FqHpYAwwe4ix3yHwDy2g@youtube.com

296 subscribers - no pronouns :c

In the heart of Indonesia stands Ecotirtan, a revolutionary


00:51
RESTO WASTE JARTEST (JARTEST PROCESS)
01:06
COMPACT WWTP 7 MPD
00:42
QC PRODUCTIONS OF ECOTIRTAN REACTOR
00:40
RO RESULT - READY FOR USE
00:51
WWTP ONLINE CONTROLLING AND MONITORING
01:17
ECOTIRTAN FOR FOOD INDUSTRY
03:17
REVERSE OSMOSIS COMMISSIONING
00:55
TECHNICAL TEAM BRIEFING
01:21
RND (RESEARCH AND DEVELOPMENT) OF CONTROLLER SYSTEM
00:58
TECHNICAL MEETING
01:04
ECOTIRTAN EXPERTS IN LIQUID WASTE PROCESSING
01:44
TEXTILE INDUSTRY LIQUID WASTE PROCESSING
01:07
ECOTIRTAN THE BEST SOLUTION FOR LIQUID WASTE PROCESSING
01:06
COOPERATION SYSTEM WITH ECOTIRTAN
02:38
INSTALLATION OF ULTRAVIOLET STERILIZER
01:04
INDUSTRIAL ELECTROPLATING USING ECOTIRTAN TUBULAR REACTOR
01:00
PRECIDING AND FOLLOWING ECOTIRTAN
01:51
ECO-TREATED CLEAR TEXTILE WASTEWATER FEATURING REACTIVE RED
02:27
SIMULATED TEST ECOTIRTAN 5 MPH - FABRIC INTENSIVE SEWAGE
00:36
INSTALLATION OF ELECTROCOAGULATION AT WWTP B3 EAST JAVA OPERATING 10 MILES EVERY HOUR
03:37
DEPLOYING HEAVY MACHINERY FOR STP BIOFILTER PLACEMENT
04:33
FILTRATION SYSTEM OPERATION, UV STERILIZER INSTALLATION, ECOTIRTAN CLARIFIER FLOTATION FABRICATION
03:29
WWTP PARMACEUTICAL INDUSTRY AFTER SIX MONTHS OF ITS OPERATION AND MAINTENANCE, STABLE RESULTS
01:41
INSTALLATION PREPARATION FOR INSTALLATION OF FILTER AND BACKWASH PUMP FITTINGS
01:56
ECOTIRTAN REACTOR POSITIONING AND INSTALLATION PROCESS
02:19
FILTRATION SYSTEM INSTALLATION MECHANISM
02:21
HOW TO DEAL WITH ELECTROPLATING PRODUCTION WASTE EFFECTIVELY AND EFFICIENTLY
02:27
SIMULATION OF TEXTILE WASTEWATER TREATMENT USING ELECTROCOAGULATION TECHNOLOGY
00:57
RESTAURANT LIQUID WASTE PROCESSING IN INDONESIA
01:02
INDONESIAN TEXTILE INDUSTRY WASTE PROCESSING
05:48
KEPEDULIAN ECOTIRTAN INDONESIA TERHADAP BENCANA DI INDONESIA
01:06
DEMO UNIT ECOTIRTAN DI DEPAN MAHASISWA TEKNIK LINGKUNGAN | ECOTIRTAN INDONESIA
00:50
HIBAH ECOTIRTAN MINIDEMO FOR ACADEMIC RESEARCH, SEMARANG
01:24
STP 500 MPD AFTER TWO YEARS
00:37
THE BEST SOLUTION FOR YOU IN BUILDING WWTP
01:37
POSITIONING MBBR PACKAGE SYSTEM FOR RESTAURANT WASTEWATER TREATMENT
04:05
COMPANY PROFILE - PROCON WATER
01:19
SURVEY FIRST, CULINARY LATER - SUBANG, WEST JAVA
01:28
RO FABRICATION PROCESS
01:03
ECOTIRTAN AND UF FOR TEXTILE
01:18
DEMO UNIT ECOTIRTAN | TRANSFORMING ECO-FRIENDLY SOLUTIONS
01:28
AWESOME!!! WASTE WATER TREATED WITH ECOTIRTAN IS USED TO WASH THE FACE
01:58
EXCELLENT RESULT - ECOTRITAN FOR WWTP PLASTIC RECYCLE INDUSTRY
01:23
WWTP 75 MPD - EQUIPMENT TEST RUNNING
02:12
DEMO - PRETREATMENT JARTEST
01:25
COUNSELING TO CLIENTS ABOUT INSTALLED WWTP OPERATIONS
01:41
REVERSE OSMOSIS (RO) HOUSING FOR WATER TREATMENT
00:46
ACTUATOR VALVE TERMINATION
01:01
ECOTIRTAN PANEL CONTROL SYSTEM
02:35
FULL EFFORT - WWTP SYSTEM INSTALATIONS, TANGERANG BANTEN
00:32
FILTRATION SYSTEM NETWORK
01:05
MILDSTEEL PUMP PIPING FABRICATION
01:18
WEEK 1: MBBR BIOCHIP - RESTAURANT RAWWASTE JARTEST
01:24
ONSITE WORK - WWTP 75 MPD
00:55
FIBER LINING PROCESS - ECOTIRTAN CLARIFIER FLOTATION
01:17
ECOTIRTAN CLARIFIER FLOTATION FABRICATION PROCESS
01:04
TOUCH DOWN - ECOTIRTAN RECEIVED BY CUSTOMER
01:13
DIFFUSER FOR AERATION - WWTP 75 MPD
01:10
WWTP EQUIPMENT DELIVERY TO THE CLIENT
00:54
TUBE FLOCCULATOR FABRICATION PROCESS