Channel Avatar

FM Don TV @UC60xkkVOmfSuvy7JgRp1hkg@youtube.com

990 subscribers - no pronouns :c

ACTUAL WORK CONSTRUCTION


08:52
THIRD TELCO IN THE PHILIPPINES /DITO TELECOM TOWER CONSTRUCTION. (ROOFTOP TOWER)🗼
01:18
RENDON AT KIKO MATOS PART 2 NAG KASAPUKAN NANAMAN
08:18
What is ACOTEC wall/panel HOW TO install ACOTEC WALL
04:51
FATHER'S DAY REST DAY AT INDANG CAVITE | SECOND HOME
05:30
HOW is a TOWER CRANE assembled on SITE | JACK UP of tower Crane
04:36
HOW TO APPLY CURING COMPOUND ON CONCRETE
12:19
USING CORING MACHINE TO MAKE A HOLE IN CONCRETE SLAB (ACTUAL CONSTRUCTION WORKS)
06:50
USING CORING MACHINE TO MAKE A HOLE FOR SPRINKLER PIPE (ACTUAL CONSTRUCTION WORKS)
08:55
ZUCALO PREPARATION FOR TOILET & BATH (ACTUAL CONSTRUCTION WORKS)
04:43
CONCRETE FILLER FOR ALUMINIUM FORM (ACTUAL CONSTRUCTION WORKS)
04:55
LEVELING SLAB USING ANTIQUE SURVEYING EQUIPMENT (ACTUAL CONSTRUCTION WORKS)
04:39
MANUAL JACK FOR ELEVATION (ACTUAL CONSTRUCTION WORKS)
03:55
TOOL BOX MEETING FIRE DRILL ASSESSMENT (ACTUAL CONSTRUCTION WORKS)
08:05
INSTALLATION OF METAL SCREEN FOR SEISMIC GAP (ACTUAL CONSTRUCTION WORKS)
05:45
STRATEGIES OF STEEL MAN FOR COLUMN PREPARATION USING TOWER CRANE
03:58
RECTIFICATION MAKE IN GOOD USING CONCRETE EPOXY AND SILICA SAND
02:23
SAFETY WALKTHROUGH/SITE MONITORING
04:04
BIRTHDAY PARTY IN CONSTRUCTION SITE
04:56
FLAT SLAB REINFORCEMENT REBAR PREPARATION (ACTUAL CONSTRUCTION WORKS)
07:47
Paano akyatin ang Tower Crane/SITE MONITORING (ACTUAL CONSTRUCTION WORK)
04:16
PAANO GUMAWA NG SPACER BLOCKS PARA SA SLAB AT COLUMN(ACTUAL CONSTRUCTION WORKS)
05:26
EASY SET ALUMINIUM FORMWORKS/GAANO BA ITO KAGANDA (ACTUAL CONSTRUCTION WORKS)
16:32
25k dirty kitchen/kahit tag ulan tuloy tuloy parin (ACTUAL CONSTRUCTION WORK)
05:35
PROPOSED OFFICE DESIGN
06:19
CONSTRUCTION WORKER SURPRISED MEDICAL (ACTUAL CONSTRUCTION WORK)
06:43
THE MAIN CONTROL OF A BUILDING, ELECTRICAL WORKS (ACTUAL CONSTRUCTION WORKS)
05:03
USING AIR COMPRESSOR/PRESSURE WASHER FOR CLEANING (ACTUAL CONSTRUCTION WORKS)
07:11
FORMWORKS COLUMN (ACTUAL CONSTRUCTION WORK)
09:39
RECTIFICATION WALL CONCRETE CRACK USING SEALBOND EPOXY (ACTUAL CONSTRUCTION WORKS)
06:41
INSTALLATION OF TIES/STIRUPS (ACTUAL CONSTRUCTION WORKS)
06:02
HOW TO MAKE BENDING TIES AND STIRRUPS (ACTUAL CONSTRUCTION WORKS)
05:53
BAKAL NA POSTE PINATUMBA NG BAGYONG ULYSSES (ACTUAL CONSTRUCTION SITE)
08:10
TOWER CRANE LIFTING WORKS (ACTUAL CONSTRUCTION WORKS)
09:49
PREPARATION SUSPENDED SLAB (ACTUAL CONSTRUCTION)
04:41
FACE REVEAL FM DON TV OWNER
09:03
TWO WAY REBAR PRECIOUS SLAB (ACTUAL CONSTRUCTION WORKS)
13:06
TABLEFORMS INSTALLATION/SLAB(ACTUAL CONSTRUCTION WORKS)
12:55
PRECIOUS SLAB PREPARATION REBAR/CONCRETING (ACTUAL CONSTRUCTION WORK)
21:13
HOW TO INSTALL TOWER CRANE (ACTUAL CONSTRUCTION WORKS)
05:52
WELDING WORKS/PIPE LINES INSTALLATION (ACTUAL CONSTRUCTION WORKS)
03:32
BACKFILLING USING BOBCAT(ACTUAL CONSTRUCTION WORK)
09:07
PILE CAP, REBAR REINFORCEMENT FTB & COLUMN (ACTUAL CONSTRUCTION WORKS)
08:47
FOUNDATION OF TOWER CRANE (ACTUAL CONSTRUCTION WORKS)
08:44
REBAR INSTALLATION PILE CAP PC90 (ACTUAL CONSTRUCTION WORKS)
11:07
LEAN CONCRETE USING BAKHO(ACTUAL CONSTRUCTION WORKS)
01:20:58
SUNDAY / Tagalog Christian Songs NonStop 2020
11:27
SUSPENDED SLAB/POURING CEMENT
07:54
TOOLBOX MEETING
08:30
HOW IT WORKS JOB MIX MAN POWER (ACTUAL CONSTRUCTION WORKS)
02:10
Strong mag. 6.6 earthquake - Leyte, Philippines on Tuesday, 18 August 2020
10:06
RAMP POURING (ACTUAL CONSTRUCTION WORK)
05:57
INSTALLATION OF FORMWORKS FOR SUSPENDED SLAB
08:46
INSTALLATION OF REBAR FOR 2 WAY SUSPENDED SLAB
04:54
INSTALLATION OF REBAR FOR RAMP (ACTUAL CONSTRUCTION WORK)
08:18
SAND BAGGING & BACKFILLING + PILE HACKING
07:20
TRENCH DRAIN AND ISLAND STAIR PREPARATION IN BASEMENT AREA
08:26
FORM WORKS USING FLASHFORM
06:58
PAST FORWARD HIGHRISE BUILDING (ACTUAL CONSTRUCTION WORK)
02:45
ACTUAL BUILDING CONSTRUCTION (TIME LAPS)
12:55
LAYOUTING, SURVEYING (ACTUAL CONSTRUCTION WORKS)