Channel Avatar

Iris Denise Tommelein @UC3elvk5Z3tBYjFIMn3aAVQQ@youtube.com

69 subscribers - no pronouns :c

More from this channel (soon)


09:56
IGLC28 0029 “Achieving Excellence in Lean Implementation at Construction..." by Valente et al.
10:30
IGLC28 0132 "Sustainability Performance Evaluation in Building..." by Cruzado-Ramos and Brioso
10:09
IGLC28 0131 “Using 5D Models and CBA for Planning the Foundations and..." by Suarez et al.
15:36
IGLC28 0135 “Takt Performance Indicators” by Haugen et al.
09:55
IGLC28 0017 “Takt Maturity Model..." by Lehtovaara et al.
10:39
IGLC28 0141 “Negative Effects of Design-bid-build Procurement on Construction...” by Kortenko et al.
10:01
IGLC28 0127 “Effects of Partnering Elements: An Exploratory Case Study" by Falch et al.
10:28
IGLC28 0125 “Application of Integrated Project Delivery Practices in...” by Jenkins et al.
09:09
IGLC28 0124 “Implementation of Production System Design in House Building...” by Barth et al.
10:32
IGLC28 0123 “Experiences from Allowing Maximum Two Contract Tiers in the Vertical...” by Aure et al.
09:44
IGLC28 0121 “Investigation of the use of Lean Construction Practices in...” by Al Heet et al.
09:24
IGLC28 0119 “Quantitative Framework for Measuring Effectiveness of Big Boom” by Joshi et al.
10:13
IGLC28 0115 “Lean Construction Planning Subject to Variations in Detailed..." by Shuvo and Lu
08:21
IGLC28 0110 “Dynamics Model of the Flow Management of Construction Projects...” by Cano and Rubiano
09:50
IGLC28 0103 “Virtual Design and Construction Application During the Bidding Stage of...” by Correa
10:37
IGLC28 0108 “Applying BIM Tools in IPD Project in Peru” by Erazo et al.
13:25
IGLC28 0109 “Influence of Integrated Teams and Co-location to Achieve the Target...” by Gutierrez
20:00
IGLC28 0097 “Impact on Productive Stability Caused by Variations of...” by Souza and Fontanini
07:27
IGLC28 0094 “What drives our Project Teams?” by Schöttle
10:42
IGLC28 0093 “Does your Decision-making Process Protect Customer Value?” by Schöttle et al.
10:18
IGLC28 0091 “Application of the Last Planner¼ System in a Sports...” by Erazo-Rondinel et al.
19:43
IGLC28 0090 “Using Reasons for Non-Compliance to Assess Project Performance..." by Lagos et al.
18:27
IGLC28 0099 “Use of Complaint Records of Maintenance Departments..." by Bazzan et al.
09:54
IGLC28 0089 “Implementation of Last Planner¼ System in an Infrastructure Project” by Kassab et al.
10:09
IGLC28 0087 “Maturity of TVD Implementation in Norwegian Public Building Projects” by Smoge et al.
10:43
IGLC28 0086 “Comparing Road Construction Projects Against an IPD Standard” by Malvik et al.
12:59
IGLC28 0084 “Chain of Wastes: The Moderating Role of Making-do” by Fireman and Saurin
10:22
IGLC28 0082 “Analysis of Making-do Waste at Construction Site in Fortaleza...” by Santos et al.
21:18
IGLC28 0080 “Optimized Installation Flow – A Strategy for Substantial Cycle...” by Gabai and Sacks
09:52
IGLC28 0077 “Application of Dynamic Spreadsheets in the Analysis of Waste by...” by Amaral et al.
09:54
IGLC28 0073 “Collaboration Barometer – Development of a Tool for Measuring..." by Haghsheno et al.
09:51
IGLC28 0072 “Keeping Track of Productivity in House-building” by Jimenez, Ilar, and Stehn
10:17
IGLC28 0071 “Digital Visual Management Tools in Design Management” by Pedo et al.
11:14
IGLC28 0070 “Design-Build Contracts in Norwegian Road Projects” by Riksheim et al.
20:05
IGLC28 0061 “Visual Tool for Workload Leveling using the Work Density Method for..." by Singh et al.
08:52
IGLC28 0069 “How does Takt Production contribute to Trade Flow in Construction?” by Kujansuu et al.
16:06
IGLC28 0067 “An Approach to Capture Design and Construction Lessons Learned..." by Murguia et al.
09:56
IGLC28 0068 “Waste in Design Management Operations from the Viewpoint..." by Uusitalo et al.
19:29
IGLC28 0064 “Front-End Design and Value Generation: a Housing..." by Serugga et al.
10:07
IGLC28 0060 “Using BIM with the Last Planner¼ System to Improve Constraints...” by Etges et al.
10:43
IGLC28 0059 “Barriers to Implementing Solar Energy Systems in Buildings...” by Florez and Ghazali
10:56
IGLC28 0058 “Accelerating the LPS Uptake using Virtual Reality and..." by Liu et al.
20:12
IGLC28 0050 “Why is Product Modularity Underdeveloped in Construction?” by Rocha and Koskela
10:24
IGLC28 0049 "Lean Tools Proposal to Mitigate Delays and Cost Overruns..." by GĂłmez-Cabrera et al.
10:31
IGLC28 0048 “Schedule Optimization of a Large Hospital Project..." by Iordanova et al.
09:59
IGLC28 0047 Exploring the Integration of Last Planner System, BIM and...” by Wickramasekara et al.
10:01
IGLC28 0044 “Measuring Project Value: A Review of Current Practices and...” by Khalife and Hamzeh
10:08
IGLC28 0040 “Empirical Assessment of the Impact of VDC and Lean on Environment..." by Maraqa et al.
10:03
IGLC28 0039 “Model of Evaluation of Sustainability Performance in..." by Brioso and Cruzado-Ramos
11:01
IGLC28 0038 “Finding the Way to Success in Implementing Lean Construction...” by Koohestani et al.
07:14
IGLC28 0036 “Identifying Management Practices for the Implementation..." by Salvatierra and Fuentes
10:29
IGLC28 0032 “Influence of the Built Environment on Patient Safety and...” by Ransolin et al.
08:57
IGLC28 0035 “Towards a Lean Behavior Evaluation System in Latin American...” by Salvatierra et al.
10:31
IGLC28 0030 “Integrated Simulation and Lean Approach for Production Line..." by Darwish et al.
09:38
IGLC28 0025 “Lean Construction Principles and Railway Maintenance Planning” by Ivina and Olsson
10:01
IGLC28 0022 “Construction Workers Situational Awareness–An Overlooked Perspective" by Görsch et al.
08:00
IGLC28 0021 "The Role of Digitalized Visual Management to Empower..." by Reinbold et al.
10:37
IGLC28 0020 “Production Process Evaluation for Earthworks" by Haronian and Sacks
09:56
IGLC28 0019 “Value Stream Map and Visilean¼ for Prefabricated Concrete...” by Kanai and Fontanini
11:39
IGLC28 0018 “Integrated Project Delivery Adoption Framework for..." by Pal and Nassarudin