Channel Avatar

PRIYA RAI @UC-0NsGQl7S6CpZc8yqEySWw@youtube.com

997 subscribers - no pronouns :c

Hello Everyone You can follow this channel for my class vid


01:00:23
CE802D (PAVEMENT DESIGN) II LEC 3 II FACTORS AFFECTING PAVEMENT DESIGN
01:06:48
CE802D (PAVEMENT DESIGN) II LEC 1 II INTRODUCTION TO PAVEMENT LAYERS
39:10
Design of Dowel Bar (IRC 58) | Rigid Pavement | pavement design
45:02
DESIGN OF DOWEL BAR IN RIGID PAVEMENT AS PER IRC 58 (NEW METHOD)
18:11
M.Tech: Is it the Right Career Option?
43:56
BAR BENDING SCHEDULE (PART 1) || QUANTITY SURVEY_LEC 13
44:19
CE(PC)601 (CEM) II LEC 25 II CONSTRUCTION EQUIPMENTS (PART2)
46:21
CE(PC)601 (CEM) II LEC 24 II CONSTRUCTION EQUIPMENTS (PART1)
46:30
EARTHWORK CALCULATION IN ROAD EMBANKMENT | QUANTITY SURVEY
51:11
EARTHWORK IN ROAD EMBANKMENT (PROBLEM EXPLAINED) || QUANTITY SURVEY_LEC 11
44:41
CE(PC)601 (CEM) II LEC 23 II PROJECT MANAGEMENT (PART 14) II CRASHING OF PROJECT NETWORK
46:03
CE(PC)601 (CEM) II LEC 22 II PROJECT MANAGEMENT II CLASS ASSIGNMENT 5
39:37
CE(PC)601 (CEM) II LEC 21 II PROJECT MANAGEMENT (PART13) II PROBABILITY IN PERT WITH CALCULATOR
44:34
METHODS OF CALCULATION OF EARTHWORK IN ROAD EMBANKMENT || QUANTITY SURVEY_LEC 10
44:47
PROBABILITY OF PROJECT COMPLETION || PERT ANALYSIS_PART3 || PROJECT MANAGEMENT (PART12) || CPM_LEC20
36:17
CRITICAL PATH IN PERT NETWORK DIAGRAM_PART2 || PROJECT MANAGEMENT (PART11) || CPM_LEC19
37:50
PERT - Program Evaluation and Review Technique | Network Diagram in Project Management
47:24
CLASS ASSIGNMENT ON NETWORK DIAGRAM || PROJECT MANAGEMENT (PART 9) || CPM_LEC 17
47:41
EARTHWORK IN ROADS (PART1) || QUANTITY SURVEY_LEC 9
46:59
ESTIMATE OF UNDERGROUND RESERVOIR || QUANTITY SURVEY_LEC 8
42:37
Critical Path Method in Network Diagram | Total Float, Free Float, Independent Float
49:18
TYPES OF FLOAT OR RELAX || NETWORK DIAGRAM || PROJECT MANAGEMENT (PART 8) || CPM_LEC15
38:33
CRITICAL PATH BY RELAX OR FLOAT METHOD || NETWORK DIAGRAM || PROJECT MANAGEMENT (PART7) II CPM_LEC14
53:42
MCQS ON PROJECT MANAGEMENT || NETWORK DIAGRAM || CONSTRUCTION PLANNING MANAGEMENT_LEC 13
47:38
CENTER LINE METHOD || BUILDING ESTIMATE OF A ROOM WITH PARTITION WALL || QUANTITY SURVEY_LEC 5
40:44
CRITICAL PATH BY SLACK METHOD || NETWORK DIAGRAM || PROJECT MANAGEMENT (PART6) || CPM_LEC12
54:23
EARLY START, LATEST FINISH TIME_NUMERICAL || NETWORK DIAGRAM || PROJECT MANAGEMENT_PART5 ||CPM_LEC11
41:24
Center Line Method Estimate | Building Estimate | Quantity Survey
46:37
EARLY START TIME & LATEST FINISH TIME IN NETWORK DIAGRAM || PROJECT MANAGEMENT_PART4 || CPM_LEC 10
45:24
Long Wall Short Wall Method of estimation | Quantity Survey
44:20
How to draw Network Diagram (CPM) | Rules of Project Network Diagram
45:56
Network Diagram Elements | Network Diagram Analysis in Project Management
47:23
PHASES OF PROJECT MANAGEMENT || PROJECT MANAGEMENT_PART 1 || CONSTRUCTION PLANNING MANAGEMENT_LEC 7
40:25
Building Line and Control Line | Open spaces and Setback distance | Building Bye Laws
36:53
FLOOR AREA RATIO CALCULATION EXAMPLE || CONSTRUCTION PLANNING MANAGEMENT_LEC 5
43:55
FLOOR AREA RATIO FORMULA || BUILDING BYE LAWS_PART2 || CONSTRUCTION PLANNING MANAGEMENT_LEC 4
46:28
WHAT IS ESTIMATE AND ITS TYPES || QUANTITY SURVEY_LEC 2
45:17
Building Bye Laws | Carpet Area, Builtup Area, Super Builtup Area as per RERA
46:24
Building Planning Principles (part2)
47:41
WHAT IS QUANTITY SURVEYING AND ESTIMATE? || OVERVIEW OF THE SUBJECT_LEC 1
47:50
Principles of Building Planning (part1) | hindi lecture
01:14:56
REVISION SESSION II INCONSISTENCY OF RAINFALL (DMC) II HYDROGRAPH II WRE (LEC 53)
21:48
DOUBT CLEARANCE SESSION II CONFLICT POINT AT ROAD INTERSECTION II TRANSPORTATION ENGG (LEC 55)
46:05
PRACTICE SESSION II TRANSPORTATION ENGG (LEC 53)
45:04
DOUBT CLEARANCE SESSION II CRITICAL COMBINATION OF STRESSES II TRANSPORTATION ENGG (LEC 54)
45:54
PRACTICE SESSION II WATER RESOURCES ENGG (LEC 51)
46:05
PRACTICE SESSION II TRANSPORTATION ENGG (LEC 52)
32:18
PRACTICE SESSION II WATER RESOURCES ENGG (LEC 52)
44:19
MOVING OBSERVER METHOD II TRAFFIC ENGG II TRANSPORTATION ENGG (LEC 51)
33:22
MOVING OBSERVER METHOD (FLOATING CAR METHOD) || PRACTICE SESSION || TRAFFIC ENGG
17:45
Khosla theory of Rainfall Runoff relationships | Engg Hydology
51:07
FUNDAMENTAL TRAFFIC FLOW DIAGRAM II TRAFFIC FLOW THEORY II TRAFFIC ENGG
49:33
traffic signal design by webster method (numerical) | traffic engg | transportation engg (lec50)
48:18
Traffic Signal Design by Webster Method (theory) | traffic engg | engg (lec49)
35:07
ECONOMICS OF CANAL LINING (PROBLEM EXPLAINED) || IRRIGATION ENGG || WRE (LEC 48)
51:49
Traffic Signal Design by Trial Cycle Method | Traffic Engg | Transportation Engg (Lec 48)
51:19
ECONOMICS OF CANAL LINING II IRRIGATION ENGG II WATER RESOURCES ENGG (LEC 47)
40:59
ROAD INTERSECTION II TRAFFIC ENGG II TRANSPORTATION ENGG (LEC 47)
33:05
Thiessen Polygon Method |Mean Precipitation over area | Engineering Hydrology
41:56
Traffic Signs & Traffic Markings | Traffic Engg | Transportation Engg (Lec46)