Videos Web

Powered by NarviSearch ! :3

Mumbai Coastal Road Tunnel experienced in a Lamborghini Huracan

https://www.youtube.com/watch?v=z1OqXX3XYx8
Phase 1 of Mumbai's Coastal Road is set to open to traffic soon. A vital element of the ambitious project is a twin tunnel between Breach Candy and Marine Dr

Exclusive Drive On India's First Ever UNDERSEA Tunnel | Mumbai Coastal

https://www.youtube.com/watch?v=UpJN-Bxzcaw
🌊 Dive deep into the heart of Mumbai's transformative Coastal Road Project, a groundbreaking initiative that is set to redefine the city's skyline and revol

Mumbai Coastal Road Project: Second tunnel breakthrough today, what it

https://indianexpress.com/article/mumbai/mumbai-coastal-road-project-2nd-tunnel-breakthrough-to-take-place-8636373/
00:00. 1x 1.5x 1.8x. The breakthrough of the second underground tunnel of the Mumbai Coastal Road Project (MCRP) is set to take place today (Tuesday) afternoon at around 2 pm at Priyadarshini Park (PDP) near Breach Candy. Maharashtra Chief Minister Eknath Shinde is expected to be present at the event of the tunnel breakthrough along with

Mumbai coastal road inaugurated today: All you need to know

https://indianexpress.com/article/cities/mumbai/mumbai-coastal-road-all-you-need-to-know-9207313/
The high speed corridor stretches for 10.58 km between Marine Drive and the Bandra-Worli Sea Link (BWSL). After Monday's inauguration, a 9.5 km-long stretch would be made operational. The total cost of the project is Rs 13,983 crore. Here's all you need to know: Key aspects of the Mumbai Coastal Road. Total number of vehicular lanes: 8 (4×

Coastal road: Second tunnel 'breakthrough ... - Hindustan Times

https://www.hindustantimes.com/cities/mumbai-news/mumbai-coastal-road-project-achieves-breakthrough-as-second-tunnel-boring-completed-after-five-month-delay-101685474814752.html
The Mumbai coastal road tunnels are equipped with the Saccardo Ventilation System, developed for the first time in India, to provide a longitudinal air flow inside the tunnels Explore Search

Mumbai Coastal Road Tunnel, Lamborghini Huracan price, Toll, Mumbai

https://www.autocarindia.com/auto-videos/howling-through-the-mumbai-coastal-road-tunnel-in-a-lamborghini-huracan-video-430639
Howling through the Mumbai Coastal Road Tunnel in a Lamborghini Huracan Video. The 2km long tunnel allows you to travel from Breach Candy to Marine Drive in around 2 minutes.

Mumbai Coastal Road Project: Breakthrough for 2nd underground tunnel

https://www.mumbailive.com/en/infrastructure/breakthrough-for-2nd-underground-tunnel-of-mumbai-coastal-road-project-78883
The boring of the second tunnel of the Brihanmumbai Municipal Corporation ()'s ambitious project was finally completed on Monday evening, May 29, 2023, after five-month delay.The work on it started on April 1, 2022. Thereafter, a breakthrough of second underground tunnel of the Mumbai Coastal Road Project was conducted on Tuesday afternoon, May 30, at Priyadarshini Park near Breach Candy.

Mumbai's $30 Billion Infrastructure Makeover: Coastal Road Project

https://www.bloomberg.com/news/newsletters/2024-01-11/mumbai-s-30-billion-infrastructure-makeover-coastal-road-project-mthl-metro
The Mumbai Trans Harbour Link, India's longest bridge, will open to traffic on Jan. 12, followed by the coastal road south in February and the north phase of the island city metro line by mid-year

Mumbai Coastal Road Project: The Road by the Sea - The Indian Express

https://indianexpress.com/article/india/bandra-worli-sea-link-mumbai-coastal-road-project-marine-drive-bmc-7197457/
Total project cost of the coastal road project is 10.58 km. Construction cost is Rs 8,429 crore. 8-lane road to be built under sea and on reclaimed land. Express Photo by Ganesh Shirsekar. While work on a section of the northern half of the Coastal Road — from Bandra to Versova — has begun too, it's the southern part that is attracting

Project in-depth: The Mumbai coastal road project - RTF

https://www.re-thinkingthefuture.com/case-studies/a9521-project-in-depth-the-mumbai-coastal-road-project/
The Mumbai coastal road project is a proposed 8-lane, 29.2-km long freeway that would run along the western coastline of Mumbai, India. The project aims to provide a faster and more efficient transportation option for Mumbai commuters and ease traffic congestion in the city. The project has been controversial since its inception, with some

Mumbai Coastal Road Project: delivering a transformational expressway

https://www.egis-group.com/projects/mumbai-coastal-road-project
The Mumbai Coastal Road Project will help decongest traffic along the west coast of Mumbai from Marine Drive to the Bandra Worli Sea Link, (BWSL) and significantly contribute to cutting transportation-related pollution. A BRT system for fluid public transport. MCRP is also an opportunity to introduce of a bus rapid transit (BRT) system, which

Coastal Road: All you need to know about this Rs 12,700-crore Mumbai

https://timesofindia.indiatimes.com/city/mumbai/all-you-need-to-know-about-this-rs-12700-crore-mumbai-road-project/articleshow/86473603.cms
"The Mumbai Coastal Road Project, from Marine Drive to the Worli end of the Bandra-Worli Sea Link, will have a total length of roughly 26 km, including 16 km of interchangers at three locations

Mumbai's Ambitious Coastal Road Project Completes Excavation Of First

https://www.ndtv.com/india-news/mumbais-ambitious-coastal-road-project-completes-excavation-of-first-tunnel-under-malabar-hill-2700319
Mumbai's most ambitious road project to decongest the city and provide relief from traffic marked a huge milestone today with the completion of the excavation of the first tunnel connecting the

Coastal Road (Mumbai) - Wikipedia

https://en.wikipedia.org/wiki/Coastal_Road_(Mumbai)
Coastal Road (Mumbai) Dharmveer Swarajya Rakshak Chhatrapati Sambhaji Maharaj Coastal Road [2] is a 8-lane, 29.2-km long grade separated expressway along Mumbai's western coastline connecting Marine Lines in the south to Kandivali in the north. [3] It is projected to be used by 130,000 vehicles daily, and is expected to reduce travel time

The Coastal Road Tunnel Project Mumbai - Progress Monitoring - OpticVyu

https://blog.opticvyu.com/coastal-road-tunnel-project-progress-monitoring/
Mumbai's ambitious coastal road project is India's largest tunnel project, being constructed 20 meters below the Shore of the Arabian Sea and 70 meters below Malabar Hill. This coastal road tunnel has a diameter of 12.19 meters and three lanes for south and north-bound traffic. Excavation of the First Tunnel from Priyadarshani Park to

Mumbai's Historic Leap: First Undersea Tunnel and Toll-Free Coastal

https://www.nativeplanet.com/news/mumbai-s-historic-leap-first-undersea-tunnel-and-toll-free-coastal-road-now-open-011513.html
Seamless Connectivity: The Toll-Free Mumbai Coastal Road has significantly slashed travel time between Marine Drive and the Bandra-Worli Sea Link, reducing it from 45-50 minutes to less than 10 minutes. A testament to efficient urban planning. Fuel Savings and Environmental Harmony: The project aims at a 34% reduction in fuel consumption

Mumbai's coastal road project: 330 metres of tunnelling completed, says

https://www.hindustantimes.com/cities/others/mumbais-coastal-road-project-330-metres-of-tunnelling-completed-says-civic-body-101619725904907.html
Mumbai's coastal road project: 330 metres of tunnelling completed, says civic body. By Mehul R Thakkar . Apr 30, 2021 01:21 AM IST . ... wherein the actual tunnel would be only 1.9km, but after

Mumbai Coastal Road to be partially accessible from Feb 20; know key

https://www.knocksense.com/mumbai/mumbai-coastal-road-to-be-partially-accessible-from-feb-20-know-key-features
According to the BMC Commissioner, the coastal road is slated to be accessible to the public, by May 15. Key Features: 2.19 km of bridges and 4.35 km of reclaimed roads, are also part of the project. While the northbound tunnel was bored from April 2022 to May 2023, the southbound tunnel was excavated from January 2021 to January 2022.

High-speed coastal road corridor: A sea-change in the way Mumbai drives

https://indianexpress.com/article/cities/mumbai/high-speed-coastal-road-corridor-a-sea-change-in-the-way-mumbai-drives-8586293/
The Coastal Road is also set to reduce fuel consumption by 35 per cent, besides bringing down noise and air pollution reducing carbon footprint by 1,826 tons annually. Significance. The idea of the Coastal Road was first floated in 2012, as an alternative to the Western Express Highway (WEH) to improve north-south connectivity in Mumbai.

Mumbai Coastal Road Project to Revolutionize Western Sea Face ... - News18

https://www.news18.com/auto/mumbai-coastal-road-project-to-revolutionize-western-sea-face-cut-travel-time-from-40-to-12-mins-7479793.html
The Coastal Road project, with a budget of Rs-12,721 crore, aims to connect north and south Mumbai and significantly reduce travel time from over 40 minutes to just 12 minutes. The project also includes the construction of the city's first undersea tunnel, a 40-foot wide passage that will connect the prosperous Marine Drive to Bandra, and

Maharashtra chief minister Eknath Shinde inaugurates Mumbai Coastal

https://www.hindustantimes.com/cities/mumbai-news/maharashtra-chief-minister-eknath-shinde-inaugurates-mumbai-coastal-road-project-101710142581601.html
The south-bound arm and 9.5 kilometres of the 10.58-kilometre high-speed corridor of the coastal road will be opened to traffic for the public on Tuesday morning | Mumbai news

Mumbai Coastal Road - Details, Map, Route And Latest Updates

https://www.mumbaimetrotimes.com/mumbai-coastal-road/
The Mumbai Coastal Road is a major infrastructure project that aims to create a 35.6-kilometer-long, eight-lane coastal road in Mumbai, India. The project is being developed by the Municipal Corporation of Greater Mumbai (MCGM) and is expected to transform the way people travel in and around the city.Overall, the Mumbai Coastal Road is expected

Mumbai Coastal Road Project: Current Status, Completion Date & More Info

https://www.lodhagroup.in/blogs/mumbai-coastal-road-project-current-status-completion-date
Mumbai Coastal Road Completion Date: On March 11, 2024, Maharashtra Chief Minister Eknath Shinde inaugurated Phase 1 of the coastal road, spanning from Worli to Marine Drive in South Mumbai. Vehicles Allowed: Cars and buses are the only vehicles permitted on the Mumbai Coastal Road. Access is restricted for two-wheelers, three-wheelers, and