Quick "show and tells"
31 videos • 75 views • by The doing, not the done.
One-take quick updates, typically end of day.
1
S&T 001 - starting the gearbox mounts to fit a Reliant engine into an Austin 7 chassis
The doing, not the done.
Download
2
S&T 004 - Crosstube to hang pedal box from Reliant over an Austin 7 chassis
The doing, not the done.
Download
3
S&T 024 - Bending in the vice beats a metal cheap folder
The doing, not the done.
Download
4
S&T 012 - Engine supported on welded mounts. Reliant engine and box into an Austin 7 chassis.
The doing, not the done.
Download
5
S&T 010 - Austin 7 steering checks. Chassis modifications for a Reliant engine gearbox and pedals.
The doing, not the done.
Download
6
S&T 011 - Alignment issues with second module. Welding frame to fit a Reliant engine to an Austin 7.
The doing, not the done.
Download
7
S&T 031 - Paint done, tube bending experiments
The doing, not the done.
Download
8
S&T 016 - Finally some welds I'm not grinding
The doing, not the done.
Download
9
S&T 019 - A look at the bare chassis
The doing, not the done.
Download
10
S&T 026 - Managing distortion from pressing the dimples
The doing, not the done.
Download
11
S&T 027 - Battery tray welded
The doing, not the done.
Download
12
S&T 020 - Frame is reassuringly sturdy
The doing, not the done.
Download
13
S&T 002 - gearbox cross member to fit a Reliant engine into an Austin 7 chassis
The doing, not the done.
Download
14
S&T 015 - Managing weld distortion
The doing, not the done.
Download
15
S&T 006 - Austin 7 steering box wedge from 3mm steel plate
The doing, not the done.
Download
16
S&T 003 - Jigging a Reliant pedal box above my Austin 7 chassis
The doing, not the done.
Download
17
S&T 025 - Pressing dimples with a pair of sockets
The doing, not the done.
Download
18
S&T 014 - Chain hoist is a winner
The doing, not the done.
Download
19
S&T 021 - Plates to join to original engine mounts
The doing, not the done.
Download
20
S&T 007 - Review progress on Reliant engine into Austin 7 chassis, nearly time to start welding.
The doing, not the done.
Download
21
S&T 005 - Triangulating the pedal support beam, Reliant pedal box, Austin 7 chassis
The doing, not the done.
Download
22
S&T 018 - Weld quality variable!!! Practice practice practice...
The doing, not the done.
Download
23
S&T 009 - First welding. Steering box wedge and two cross members. Austin chassis, Reliant engine.
The doing, not the done.
Download
24
S&T 023 - Bought a battery, Craftsmaster paint arrived, tube bending experiments
The doing, not the done.
Download
25
S&T 017- Making all the tiny errors one manageable misalignment
The doing, not the done.
Download
26
S&T 030 - Craftsmaster paints, "engine enamel" steel tube frame
The doing, not the done.
Download
27
S&T 029 - Craftsmaster paints, priming a steel tube frame
The doing, not the done.
Download
28
S&T 028 - Plug welding and DONE
The doing, not the done.
Download
29
S&T 008 - Tubes all cut for Reliant engine subframe for an Austin 7 chassis
The doing, not the done.
Download
30
S&T 022 - Making the misalignment look intentional
The doing, not the done.
Download
31
[Private video]
Download