Channel Avatar

APURBA ELECTRICAL @UCfAtgqnWDI83ylcMbvKK5RQ@youtube.com

369 subscribers - no pronouns :c

All industrial electrical work, PLC panel problem, LT line e


30:32
AIR COMPRESSOR MAINTENANCE
03:38
Maintenance of A.S.M.
26:24
INVERTER 30KVA
06:36
cable connection.
02:54
BOILER 3TON PREVENTIVE MAINTANANCE
17:34
ELECTRICAL PANEL CABLE WIRE INTERCHANGE
11:46
stainer clean water pump
12:30
water pump fitting.
28:37
HOMOGNISER REPAIRING
17:05
NEW DG 500KVA INSTALATION
12:04
TRANSFORMER SECONDARY TERMINAL CHANGE DUR TO OIL LEAKAGE. NEW TERMINAL FITTING AND OIL REFILLING.
14:30
conver belt chane change.
01:14
DIGITAL LIQUID FLOW METER SETTING
01:49
A.C 240 volt contractor dismental
02:09
DIGITAL reactive power manager METER SETTING
02:45
pasteuriser
08:18
gas welding 🥽
04:07
instalation of 900 feet borewell
01:57
homogeniser rotary pump oil change and cleaning of gear box
02:52
both side mechanical seal fitting pump
00:39
VFFS MACHINE PANEL.
01:09
digital flow meter setting (2)
03:59
food grade water pump 16 May 2023
07:42
WHAT IS PNP & NPN SENSORS ( NO, NC) in assmese.
07:09
MEGGER in assmese
12:30
C.G DRIVE SK. (cromton greaves) VFD electricial connection and perameters sitting in assmese
04:36
MCB TYPES B, C, D, K, Z in assmese
06:55
MCB & MCCB DIFFERENCES explain in assmese
07:21
3 phase Motor full load current, no load current, starting current in ASSMESE
03:25
KW TO HP CONVERT IN ASSMESE
02:10
S.M.P.S INPUT & OUTPUT CONNECTION in assmese.
01:43
ADD ON BLOCK in assmese
05:43
Star and Delta connection in motor terminal assmese
05:07
Selec 800s ON DELAY TIMER WIRING IN ASSMESE,
08:55
DOL STARTER, HOLDING OF A CONTECTOR, in assmese
15:09
SUB ZERO TEMPERATURE CONTROLLER ASSMESE