Channel Avatar

Alan Yates @UC_qnstrfqLzopNGSWP5lOng@youtube.com

10K subscribers - no pronouns :c

Diverse geeky musings


02:07
Studio Construction - Day 41 - Dormer Cheek Walls and Roof Common Rafters
00:43
Studio Construction - Day 40 - Dormer Cheek Wall Layout
01:25
Studio Construction - Day 39 - Dormer Wall Framing
00:38
Studio Construction - Day 38 - Stairs Relocation and North Pony Wall
01:36
Studio Construction - Day 37 - Cathedral Roof Framing
01:59
Studio Construction - Day 36 - East Gable Framing
01:02
Studio Construction - Day 35 - West Gable Wall
01:07
Studio Construction - Day 34 - West Gable Framing
02:08
Studio Construction - Day 33 - Shear Sheathing and Building Wrap
01:06
Studio Construction - Day 31 - Various Preparations
01:37
Studio Construction - Day 32 - Loft Pony Wall and Ridge Beam
01:54
Studio Construction - Day 30 - Loft Stairs
01:47
Studio Construction - Day 29 - Loft Subfloor
01:00
Studio Construction - Day 28 - Loft Floor Framing
00:56
Studio Construction - Day 27 - Top Plate Marking
00:35
Studio Construction - Day 26 - Rough Stairs
01:05
Studio Construction - Day 25 - East and North Walls
01:18
Studio Construction - Day 24 - South Wall Up, East Wall Layout
00:43
Studio Construction - Day 23 - South Wall Layout and Headers
00:58
Studio Construction - Day 22 - West Wall and Loft Beam
00:24
Studio Construction - Day 21 - Post Lamination
01:12
Studio Construction - Day 20 - Subfloor Sheeting
00:47
Studio Construction - Day 19 - Floor Insulation Finished
00:58
Studio Construction - Day 18 - More Floor Insulation
01:01
Studio Construction - Day 17 - Floor Insulation
00:35
Studio Construction - Day 16 - Clean-up, Blocking and Insulation
01:00
Studio Construction - Day 13 - Fixing Middle Girder and Floor Framing
00:14
Studio Construction - Day 08 - North Girder Work
00:27
Studio Construction - Day 09 - Middle Piers
00:37
Studio Construction - Day 02 - More Foundations
00:49
Studio Construction - Day 06 - Girder Lamination
00:45
Studio Construction - Day 00 - Foundation Layout
01:31
Studio Construction - Day 07 - More Pier and Girder Work
00:36
Studio Construction - Day 04 - More Pier Pours
00:52
Studio Construction - Day 05 - Girder Trial Placement
00:49
Studio Construction - Day 10 - Middle Girder Placement
00:49
Studio Construction - Day 01 - Pier hole digging
00:53
Studio Construction - Day 12 - North and South Girder Alignment and Bolting
00:20
Studio Construction - Day 11 - Middle Girder Lamination
01:22
Studio Construction - Day 03 - Pouring Piers
00:59
Studio Construction - Day 15 - Floor Frame Ties and Blocking
00:58
Studio Construction - Day 14 - Floor Framing
01:32
Ultrasound Tone Burst Spatiotemporal Pressure Measurement
02:45
Using a Ceramic Capacitor as a Hydrophone Transducer
05:21
Flashing Light Prize 2018 Entry - Neon Bistable and Cap-Ratio Divider
03:24
Flashing Light Prize 2017 Entry - Charge Dripping Flasher
06:53
Flashing Light Prize 2017 Entry - Home Made Light Bulb
00:04
Lighthouse Base Station in Slow Motion
07:38
Advent Calendar of Circuits 2014: Day 15: Pulse-Counting WBFM Receiver
01:42
Day 14: Extra Footage - De-shocker Wand in Use
05:56
Advent Calendar of Circuits 2014: Day 14: De-shocker Wand
04:57
Advent Calendar of Circuits 2014: Day 13: Field Mill
10:40
Advent Calendar of Circuits 2014: Day 12: The PN Junction Diode
06:55
Advent Calendar of Circuits 2014: Day 11: Electrostatic Annoyer
06:50
Advent Calendar of Circuits 2014: Day 10: Deluxe 9 Volt Battery Tester
01:07
Day 9: Extra Footage - Finding Studs in a Wall
08:56
Advent Calendar of Circuits 2014: Day 9: Stud Detector (Capacitive Nulling Bridge)
14:15
Advent Calendar of Circuits 2014: Day 8: Inductor Saturation Testing
16:23
Advent Calendar of Circuits 2014: Day 7: Variable Capacitors (for RF applications)
16:41
Advent Calendar of Circuits 2014: Day 6: Toroidal Inductors - The Basics