Channel Avatar

Mentors of Electrical from Mainpuri @UCPs0zYBmuMpSbffmp-mCllQ@youtube.com

1.3K subscribers - no pronouns :c

Mainpuri is a small place in UP and their are limited source


03:28
765kV Transformer Insulator Bushing Dismantling live
00:52
765kV Transformer inside
02:24
Utilization of Drons in Power Transmissions Line
01:56
EHV testing on Transformer bushing
01:26
765kV AIS Substation Transformer HV Bushing lifting technique.
01:45
765kV AIS Substation 333MVA single Transformer SFRA testing
04:04
765kV AIS Substation,Circuit Breakers SF6 Gas test Moisture & Purity Test
12:42
visit of 400 kV GIS SF6 Gas insulated substation
37:08
765kV AIS Substation Over view a visit with details
07:24
765kV AIS Substation Electrical Power System in Simple Language series-1
04:06
220 Volt Battery Bank in Substations
01:01
High voltage tenson during fault in 765 kV Circuit Breaker Jumper burnt.
08:10
Knowledge Functioning and repairing Transformer OTI meters
03:47
765/400kV Super critical 1000kV Single Phase Transformer
03:31
Reactors Noise and Vibration testing
04:07
attend troubleshooting
02:42
Filtration of transformers
07:15
Visit of Khurja at Shera Handicraft & Ceramic .Ph 7248252598
04:28
It's wonderful to open the pressure dial!
10:22
कैसे पता करें कि हमारा ट्रांसफॉर्मर खराब हो रहा है (DGA)
06:09
ज्यादा बिजली के बिल कैसे करें कन्ट्रोल
06:09
ज्यादा बिजली के बिल कैसे करें कन्ट्रोल
03:45
पीएलसीसी में आई खराबी को कैसे दूर किया PLCC troubleshoot
06:15
कैसे की जाती है ट्रांसफार्मर के ऑयल की टेस्टिंग? Transformer Oil Testing
00:12
State Load Dispech Center SLDC
00:51
कैसा दिखता है बड़े ट्रांसफार्मर का ऑनलाइन टैब चेंजर?OLTC of 315 MVA ICT
00:16
765kV CB T connector
13:55
Neem karori dham, Mainpuri to Neem Karori Mandir.
01:14
CT replacement work 400 kV
10:33
Single Phase Transformer 1000 MVA and Their Auxiliary Bus arrangement.
03:55
Lightning Arrestor Monitor
01:08
सांस लेने की देसी जुगाड़ मशीन।
02:25
Live SF6 Gas filling
02:24
A simple PPE
02:34
Nest for birds
02:57
Kisok AC
00:40
A bird come at window
02:24
Transformer and reactor Temporary cooling arrangements
06:41
Power Line Carrier communication PLCC in Substation
03:15
Split AC self Maintenance
01:45
Sanetizetion of Office
04:39
Fire Fighting Arrangement at Substations.
02:52
5 April 9 to 9min. Stress during light switch off during deep utsav
05:15
400kV CT
02:43
BPI Bipost insulators
04:01
Substation Aluminum conductors
03:15
Touch & Step Potential Use of Gravels in yards क्यों डाली जाती हैं गिट्टी यहां सब स्टेशन के अंदर?
03:30
765kV Lighting Arrestor
00:45
765kV Circuit Breaker
00:03
Fire Protection of Transformers
00:06
OTDR
00:14
765kV Isolator
02:27
315MVA Transformer PRV Maintenance