Channel Avatar

HVAC & MEP WORK KNOWLEDGE @UCNdyGIuZmjotdTWT5aMTZ7A@youtube.com

637 subscribers - no pronouns :c

Raqueeb Alam Welcome to our HVAC/MEP Engineering tutorial


06:57
Car parking ventilation system. Why to use car parking inside the basement @car parking layout
05:04
Plumbing work for Toilet waste pipe and drench water pipe #pvcpipe
01:02
Classifications of air conditioning # hvac
07:47
HVAC Project manager key job responsibility & Resume points fild HVAC engineer #Hvac #interview.
06:35
HVAC project schedule # HVAC Bar chart #Material delivery schedule #Hvac interview #hvacinstall
02:36
Central Air duct installation #rectangular duct#Gi duct#Flexible round duct# supply Air duct
03:10
Plumbing pipe installation in Hotel project kitchen #c pvc pipe hot water with insulation #Hindi
04:11
Chilled water block diagram #explaininhindi #interview #Ac #HVAC Technician #Gulf job or India
01:42
Fire pump Room # fire pump installation and explain pump details #firepump
07:20
Chiller plant schematic line drawing #chiller #chiller project and maintenance interview use full v
03:26
5.5 TR DX carrier INVERTER duct able unit and Duct installation video @hindi
06:09
VRF system Layout explain # VRF system hvac layout # multiple indoor unit connected one outdoor unit
04:08
Eliptical duct installation open ceiling and open office area #cafe area #central Air conditioning
02:13
Chilled water plant Evaporator and condenser connection details explain #condenser #chiller
02:57
Pi ductwork #installation #airconditioning #ductable unit # HVac
01:49
Toilet Exhaust fan #ventilation #home #kitchen वैरी lessnoise fan
02:39
HVAC Hotels project How to design system ,Toilet exhaust duct,VRF copper pipe and TFA duct.
02:55
Gi duct installation work tripal hight in banquet hall
04:21
MEP work in progress video
03:10
Duct fabrication and insulation video
02:49
VRF system copper pipe installation work @hvac system @ TFA unit @ ductable unit
05:31
HVAC/ AC material sample Board and pices
02:54
Aluminium cladding work CHWS and CHWR pipe Line and generator smoke Exhaust pipe cladding work
08:06
VRF Copper Pipe Brazing STANDARD WORK PARCTICE FOR ALL BRAZING WORK Hvac video
02:38
TDF flange joint and sleep joint Factory Fabricated Gi ducting boxing work
04:32
Ceiling suspended AHU hanging 4000 cfm installation process@AHU#Air Handling Unit
01:49
Pi duct installation and flexible round duct inside the gypsum ceiling
05:27
centrifugal water cooled chiller 400TR and cooling Tower @chiller plant room@ Hvac #hindi #hvac
04:40
Supply Air Diffuser installation and flexible round dugt connection with Gi duct
12:04
AHU component details and Typical connection Hvac video# chilled water valves connection@Ahu
01:24
Plumbing work inside the shaft @Hvac/Mep
04:32
HVAC/ Mep work knowledge
01:56
Motories Fire damper cable connection inside the AHU Room/# Fire damper #Hvac
02:37
undertake insulation install for stop the heat transfer terrace floor to inside the room/ 25mm thick
03:06
VRF indoor unit installation open ceiling area /HVAC/Fresh air connection/Mitsubishi VRF
03:45
plumbing work bathroom and toilet,hot water pipe cold water pipe waste pipe drain pipe#plumbing
00:25
Plumbing pipe pressure test/@Bathroom/@kitchen/wash basin /
06:16
VRF indoor unit hanging, copper pipe installation and refnet installation line drawing explain/HVAC
00:44
Mobile crane 100 meters length #Boom lift Havey weight lifting with crane #trading chiller Lifting
00:23
Fire pipe welding work Not Following safety
01:33
Single bed room Electrical wiring condute work inside the gypsum ceiling and inside the wall
00:52
Spilt Ac coil leakage indoor unit check and rectify #leakage #splitac #gasleakage
07:43
TYPES OF CHILLER AND Compressors AND MAJOR COMPONENT #GULF JOB INTERVEW IMPORTANT #chiller #plant
04:44
Dol starter motor panel for AHU Exhaust Fan 4kw 2 motor panel# Dol starter panel #Hvac # Exhaust
03:55
Ahu Room wall Acoustic insulation for sound proof Ahu noise not transfer other areas#Hvac AHU room
12:25
Chiller plant type of water cooled Schematic DRAWING COOLING TOWER# Gulf job interview
10:14
TYPES OF VALVE USED IN HVAC PLANT AND PIPE #CHILLER PLANT VALVE # HINDI Language@interview question
15:00
Split AC wet service and jet service process in Hindi language #jet pump # HVAC #ac #ac cleaning
02:04
AC TR calculation thumb rule according bed room and office area TR capacity calculation
11:47
VRV/VRF SYSTEM INSTALLATION #VRF COOPER PIPE# REFNET JOINT# COMMUNICATION CABLE #Hindi
07:34
Electronically commutated (EC) motor is designed to run on an alternating current (AC) #smart Ahu
01:07
Raceway cutting for Data cable and electrical cable.#Internet cable #under the floor bottom etc
05:49
TYPES OF DUCT#RECTUNGULAR DUCT# ELPTICAL DUCT#ROUND DUCT#FLEXIBLE ROUND DUCT#HVAC# Hindi
04:15
REFRIGERATION CYCLE Hindi/Hvac video#
11:32
HVAC CHILLER PLANT SCHEMATIC VIDEO#COOLING TOWER #CONDENSER PUMP CONNECTION#MAKEUP TANK# Hindi
07:25
2AC Timer connection Carrier VRF indoor unit #HVAC Hindi language
05:05
Chiller Lifting and shifting Trace 17th floor#HVAC# Hindi language
02:46
Chilled water chiller & condenser connection explain#Chiller plant #Fitting#HVAC# Hindi language
04:25
Ac gas pressure chart#R410#R32#R407etc
09:31
VRV/VRF system?