Channel Avatar

Home in the Earth @UCKo1x0vX-wajgcoD85r6moA@youtube.com

19K subscribers - no pronouns :c

More from this channel (soon)


11:30
49: Storm Room Block Walls
05:15
Passive Solar Windows
09:29
48.0 North Stone Parapet
09:14
WaterSoftener Video
15:53
Nov28 WalkThru
34:53
47.1 Installing a 3rd function Grapple on my John Deere 2032R
18:19
47.0 Installing a Power Beyond Kit on a John Deere 2032R
15:48
46.0 Installing Windows in Shotcrete Walls
07:47
45.0 Storm Room Floor
20:33
44.2 Rubber and Insulation on the Guest Room Roof
13:27
Winter Earth Tube Update
03:06
Earth Tube short...
13:08
44.1, North-Wall Insulation, waterproofing and scratch stucco
15:52
44.0 North-Wall Insulation and Waterproofing
14:54
Home in the Earth Ealk-Thru: December 2020 w/ FLIR One Pro
16:39
43. Installing pocket-door hardware.
12:47
42.1 Concrete Floor Pour with Radiant
15:55
42.0 Prepping for a concrete floor pour
20:34
Home in the Earth Walk-Thru: August 2020
07:57
41.9: Wood Roof Section
10:22
41.9 Odd Jobs for December
14:49
Great Stuff Pro Gun Repair
06:39
41.8 Odd Jobs for November
07:20
41.7 Gunite for the South Wall
13:31
41.6 Shooting a Gunite Roof
07:06
41.5 HDPE ventilation ducts
09:41
41.4 QuadDeck ICFs for the Mezzanine Roof
17:44
41.3 Building the radial vault ceiling forms
11:28
41.2 XPS Gunite form for the South Wall
13:20
41.2, Erecting the steel for the radial vaults (Part 2)
11:58
41.0 Erecting the Radial Vault Steel (Part 1)
05:52
40.0 Spring Projects @ our home in the earth
13:59
39.2 Brown Coat Stucco for the Earth Sheltered House
10:00
39.1 Scratch Coat Stucco (Shorter version)
18:52
39.1 Scratch Coat Stucco (Full version)
06:04
39.0 EcoSmart 36kw on demand hot water heater install
08:25
38.5 Skylight Copper
05:33
38.4 Safety Fence
10:29
38.3 Earth Sheltered Home Burial, Phase 2
05:32
38.2 Stucco and Boulders
13:38
38.1 Placing the Insulation Umbrella
10:19
38.0 Earth Sheltered Home Burial, Phase 1
12:44
37.0 CMU retaining wall
08:32
August walk-thru at Home in the Earth
04:01
36.1 Scratch Coat Stucco and Blue Max
14:23
36.0 Gunite for the tower
02:32
35.2 Stucco over the Sky light curbs
09:54
35.1 Wrangin' Rebar for the Bedroom Eyebrows
17:38
35.0 Preparing the Tower for Shotcrete
08:29
34.0 Retaining Wall
11:46
February walk through
13:50
33.0 Copper parapet ridge cap tiles
05:28
32.3 Installing the rear garage door
02:15
32.2 Skylight Clearing
02:35
32.1 Quonset side door and front lights
04:00
32.0 Setting up the steel arches for the Apse
09:28
32.1 Earth Sheltered Shotcrete on the perimeter walls
06:56
32.0 OSB forms for the perimeter walls
03:58
Fixing my Dewalt Driver Chuck
08:19
31.0 Lath & Stucco for the Garage Endwalls