Channel Avatar

BOILER OPERATION ENGINEER & TURBINE @UCE9F_knwImBIw6wnWiGYLEQ@youtube.com

7K subscribers - no pronouns :c

BEST APPROACH TO KNOW ABOUT BOILER AND TURBINE.IN THIS CHANN


16:19
DM PLANT & RO PLANT INTERVIEW QUESTIONS || BOE INTERVIEW QUESTIONS || BOE PREPARATION
18:06
B.O.E. INTERVIEW // FUEL AND COMBUSTION // PROPERTIES OF STEAM
15:47
B.O.E. INTERVIEW PREPRATION //QUESTIONS FROM A R MALIC BOOK // FUNDAMENTALS // HEAT TRANSFER
13:11
SACRIFICIAL ANODE // GALVANIC CORROSION IN CONDENSER // CORROSION PREVENTION
20:15
SURFACE CONDENSER || VACCUM FUNDAMENTAL || DIRECTION OF COOLING WATER FLOW
15:06
CONCEPT OF STEAM CONDENSER || TURBINE WITH & WITHOUT CONDENSER || TURBINE WORK BENIFIT BY CONDENSER
08:53
CENTRAL BOE 2021 SOLVED NUMERICAL || BOILER EFFICIENCY || [ Take 8*H2 instead of 9*H2 in TA ]
21:23
INDIAN BOILER REGULATIONS || CETRAL BOILER OPERATION ENGINEERING || BOE SPECIAL
04:56
GUJARAT BOE 2017 NUMERICAL || CONDENSATE || RETURN CONDENSATE
04:14
GUJRAT BOE 2017 NUMERICAL || COMBUSTION || EXCESS AIR || ACTUAL AIR SUPPLY
09:59
GUJRAT BOE 2017 20 MERK NUMERICAL || BOILER EFFICIENCY CALCULATION BY INDIRECT METHOD
21:17
HOW TO FILL CENTRAL BOE FORM ONLINE // LAST DATE TO FILL FORM 25 NOVEMBER
22:43
STEAM SOOT BLOWER // BOE QUESTION // LRSB //SRSB //WALL BLOWER
26:52
CHIMNEY DRAUGHT // CHIMNEY HEIGHT // CHIMNEY DIAMETER // GUJARAT & KERLA BOE NUMERICALS
15:06
HIGH STEAM LOW WATER SAFETY VALVE // PARTS AND DISCRIPTION OF SV // BOE PREPRATION
18:33
KERLA BOE 2018 PAPER # 2 // DISADVANTAGE OF PULVERIZED COAL FIRING // WHY WE GIVE BLODOWN IN BOILER
25:53
SPRING LOADED SAFETY VALVE // SETTING OF SAFETY VALVE //BLOWDOWN ADJUSTMENT OF SAFETY VALVE // B.O.E
33:19
KERALA B.O.E. PAPER 2018 / PAPER # 1 PART - B / NUMERICALS WITH THEORY EXPLANATION
23:46
KERALA B.O.E. PAPER SOLUTION / 2018 KERALA B.O.E. PAPER / PAPER # 1
11:52
[ BOE 2021 ] || FATIGUE CORROSION || STRESS CORROSION CRACKING || BOILER TUBE FAILURE
18:47
[ BOE 2021 ] || HYDROGEN DAMAGE || OXYGEN CORROSION || BOILER TUBE LEAKAGE || POWER PLANT
17:48
[ BOE 2021 ] || LONG TERM AND SHORT TERM OVERHEATING || POWER PLANT || BOILER TUBE FAILURE
15:43
[BOE 2021] || PERFORMANCE CURVE OF SUPERHEATERS || SUPERHEATERS METAL TEMPERATURE AS PER IBR
24:01
SUPERHEATERS || PLATEN || CEILING | RADIANT | CONVECTIVE | INLINE | STAGGERED | PARALLEL |CROSS FOW
18:07
[ BOE 2021 ] / THROTTLING PROCESS / ISENTHALPIC PROCESS / CHHATTISSGARH BOE
23:17
[ BOE 2021 ] / CHHATTISGARH BOE / 2017 PAPER NUMERICAL / QUANTITY OF LIME AND SODA CALCULATION
08:41
[ BOE 2021 ] / LAP AND BUTT WELD JOINTS / NUMERICAL OF WELD JOINTS/ CHHATTISHGARH BOE 2021
23:16
[ BOE 2021 ] || STRENGTH OF MATERIAL || TARGET CHHATTISGARH BOE || CG 2017 PAPER
33:19
[ BOE 2021 ] //CHHATTISGARH BOE // 2017 PAPER NUMERICALS
15:17
[BOE 2021] /PRESSURE CONVERSION TIPS/CONFIRM SCORE/ CHHATISHGARH BOE // CG BOE PREPRATION
22:17
[ BOE 2021 ] // CHHATISHGARH BOE PREPRATION // PREVIOUS YEAR QUESTION PAPER SOLUTION // BOE 2021
20:18
[ BOE 2021 ] /TYPES OF BOILING IN BOILER / DEPARTURE FROM NUCLEATE BOILING /BOILING LIMITATIONS
20:30
# MODE OF HEAT TRANSFER IN BOILER // THRMAL POWER PLANT // CODUCTION // CONVECTION // RADIATION
14:33
[BOE 2021 ] / APH NUMERICAL /BOE PAPER # 1/ FLUE GAS SIDE EFFICIENCY/ AIR SIDE EFFICIENCY
13:54
Ljungström Air Preheater || Regenerative Air Preheater || Material of APH || Thermal Power Plant
15:49
BESTS OF BOE || RECUPERATIVE AIR PREHEATER || SIZE OF APH || FINNED TUBE APH || BOILER ACCESSORIES
17:11
MISSION BOE / ECONOMIZER NUMERICAL / BOE PREVIOUS YEAR QUESTION /NUMERICAL PREPRATION /PAPER # 1
14:53
TARGET BOE //ECONOMIZER // CONDENSING AND NON CONDENSING ECONOMIZER //ECONOMIZER MATERIALS // TUBES
16:20
POWER PLANT || DEAERATOR || DEAERARATOR EFFICIENCY || HENRY'S LAW || INVERSE SOLUBILITY OF WATER
12:01
BOILER BLOWDOWN NUMERICALS //BLOWDOWN RATE // PERCENTAGE BLOW DOWN
16:12
CBD TANK || BOE SPECIAL || BOILER BLOWDOWN || DIFFRENCE BETWEEN IBD & CBD || USE OF IBD
26:37
BOILER DRUM GAUGE GLASS || WATER LEVEL INDICATOR AS PER IBR|| BOILER MOUNTING || STEAM SPACE
09:35
BOILER MOUNTINGS || FUSIBLE PLUG || TARGET BOE
24:01
BOE || RANKINE CYCLE PROCESS ||ISENTROPIC PROCESS || VARIOUS ZONES OF RANKINE CYCLE
14:54
BOE || BOILER DOWNCOMER || CIRCULATION RATIO || FORCE CIRCULATION || ONCE THROUGH BOILER ||
23:09
BOILER || BOILER MOC || CARBON STEEL || ALLOY STEEL || BOILER MATERIAL || BOE PREPARATION IN HINDI
26:25
BOE PREPARATION || BOILER CORROSION || BOILER EROSION || FIRE & WATER SIDE CORROSION || GALVANIZE
31:15
TARGET BOE || BOILER FUEL COMBUSTION || EXPLOSIVE MIXTURE || AVAILABLE HYDROGEN ||USEFULL HEAT VALUE
34:31
BOILER FUEL/BOE/ GCV AND NCV/COAL /LIQUID FUEL/GASIOUS FUEL/TURN DOWN RATIO// TRIPLE T'S
17:09
BOE || SMURT ||BOILER OPERATION ENGINEERING PREPARATION || BOILER FLUE GAS ANALYSIS
13:04
COST OF CONDENSER VACCUM // VARIATION OF STEAM FLOW OVER CONDENSER VACCUM // VACCUM DROP
30:02
Alkalinity/ P & M Alkalinity/Alkali Boil Out/Boiler Preservation
34:48
Water Chemistry/Oxygen Treatment/LP & HP Dosing/Passivation/DR Ratio/Polishing/ Carcinogenic N2H4
36:14
DM WATER//BOILER OPERATION ENGINEER//DEMINERALISED WATER// DM WATER USED IN POWER PLANT//BOE//ION EX
26:16
भारतीय बायलर अधिनियम /INDIAN BOILER REGULATIONS
25:36
TURBINE GOVERNING SYSTEM/GOVERNING PROCESS/STARTUP OIL/TRIP OIL/SECONDARY OIL/CONTROL OIL
27:40
TURBINE LUBE OIL/BARRING OIL/GOVERNING OIL/VG46/DEMULSIFICATION OF TURBINE OIL
05:29
BOILER MANHOLE QUESTION & ANSWER BOE (BOILER OPERATION ENGINEER) DRAWING TURBINE POWER PLANT
19:00
Dished End |Elliptical Dished end |Torrispherical/ Boiler operation engineer | boe question answer
19:19
boiler operation engineer | boe| BOE |ENGINEERING DRAWING | boiler | turbine | boiler | drawing