Channel Avatar

Signal Fan Zane @UC2Te6ula2AH4lcNJIgM1u6g@youtube.com

604 subscribers - no pronouns :c

More from this channel (soon)


01:10
All red flash
02:51
3m 131
00:50
Overlap flash from 60-300 FPM. (Possible seizure warning)
02:06
Overlap load switch view.
01:42
Overlap.
03:10
New signal face.
01:41
Setting a temp span pole.
03:03
FYA version 3 Demonstration.
01:54
Some new additions.
03:09
Playing around with TOD Soft Flash.
00:26
Intersection on its final days. Weird wig-wag flash.
06:53
Signals in flash & Cycling.
04:52
FYA signal sequence corrected.
09:13
Pedestrian signal restoration.
02:30
My intersection as of 4/7/20
00:41
Intersection in the process of replacement.
01:33
Testing a 2 phase 2 ped cabinet. (Modified UPS cabinet)
05:54
My Intersection as of 10/10/19
01:21
Intersections without power. (Caught start Up)
00:38
Incandescent Eagle Signal.
00:52
Dialight insert running the countdown though the Walk interval.
02:24
My intersection as of Jun 12, 2019
01:12
Incandescent signal repaired.
03:49
Traffic signal Inductive Loop Installation.
00:40
Bad incandescent Bulb.
03:06
Hawk signal.
02:26
RRFB Installation.
01:23
Span rewire and cabinet upgrades.
02:44
My Newest Ped Signal.
00:33
Down pedestrian signal.
00:51
Upside down ped signal.
00:50
Econolite Aluminium & poly 5 section.
01:41
Strong wind storm.
00:49
Peek solar powered beacons.
00:31
ICC PED head.
00:54
Arrow board.
00:42
Polara ped button.
00:18
Austrian push button.
03:59
ICC pedestrian signals with dialight inserts.
01:53
Mid-block signalized crosswalk.
00:35
DeMco pedestrian signal.
00:08
Two double heads next to each other.
01:36
New filter install in a cabinet.
01:43
The last incandescent intersection in Clearwater Florida.
01:49
Running 5 pedestrian signals at once.
01:06
Eagle pedestrian signal.
04:56
Mid-block crosswalk signal display finished.
02:12
McCain's (with older logo), peeks, & interesting thru lane signal.
00:37
RRFB with two beacons.
01:10
Night flash.
02:48
Traffic signal removal.
01:47
Road signage improvements.
02:16
Traffic signal time laps.
03:02
Traffic signals in flash.
01:11
Testing & retiming a school beacon.
04:09
Filming signals for the first time with my new camera.
08:23
New ped Head.
01:36
Tri stud hub replacement
04:32
Pedestrian signal installation.
01:22
Road sign installation.