Channel Avatar

John Tanzillo @UC6FVqBH1WfyZSAx6-AM5doQ@youtube.com

2.5K subscribers - no pronouns :c

NOTE: All Model Railroad topics discussed on this channel ar


Bambu Lab A1 Printing the Last Three HO 52ft Flatcars Bambu Lab A1 Printing Fan Covers Bambu Lab A1 Printing 3 more HO Flatcars Bambu Lab A1 Printing 3 more HO Flatcars N -Scale Artitec Combine on the Farm Bambu Lab A1 Printing 3 each HO Great Northern Flatcars this time Bambu Lab A1 Printing Two HO Great Northern 52 ft Flatcars N-Scale figures added to the skid row side of town Bubba’s Water Supply Company N-Scale Mid-States Booze Distributor A Couple of New N-Scale Passenger Cars More 3D Printed Signs Installed 3D Printed Turnout Numbered Signs Installed The Donut Hole donut shop Bambu Lab A1 Printing Sign Holders Completed WWII Captured Japanese Midget Submarine on the Layout Bambu Lab A1 Printing Two N -Scale 40ft Flatcars Bambu Lab A1 Printing N-Scale WWII Japanese Mini Sub N Scale Piko USATC Whitcomb 65T Switcher Spline Roadbed West Helix 3D Printed Union Station Complex Anycubic Vyper Printing Large Sign Holder 3D Printed N-Scale Stock Feed Lot 3D Printed Signs Installed Anycubic Vyper Printing Sign Holders Tulsa Depot Post Office Completed The Overall Scenery Project for the Center Peninsula has been Completed Half of the Scenery has been Completed Ballast Mostly Done plus a Problem Even More Scenery Tasks Completed Today More Scenery Progress Tasks that have been accomplished The Retaining Wall has been Installed The Adjacent Scenery Areas have been Covered with Plaster Cloth and Painted More Scenery Preparatory Work Done Oops- I forgot the Retaining Wall with the Tunnel Portal in it All Retaining Walls have been 3D Printed Continuing to Work on the Retaining Walls Anycubic Vyper Printing a Modified Section of Retaining Wall Working on the placement of the Retaining Wall Anycubic Vyper Printing Retaining Walls Tasks Completed Today for the Scenery Project Phase 2 Scenery Phase 2 Preparatory Tasks The Scenery around the Tulsa Union Depot & Post Office has been Completed Adding Docks and Ballast for the Post Office Building Preliminary View of New Scenery at Tulsa Union Depot Ballast has been finished - Tomorrow is Scenery Ballast has been added to the Tulsa Depot tracks