Channel Avatar

Construction Technology & civil Work @UCLmMD9iw_4iniX2--vtPxzA@youtube.com

118K subscribers - no pronouns :c

Civil Work


09:59
Prismoidal formula prismoidal formula for earthwork road construction
07:33
Lap zone in RCC column
00:58
Standard plinth height
02:50
standard brick size & standard modular brick size
03:43
20mm thick plastering required materials
02:09
standard size of CS windows
12:24
Original ground level survey through auto Level in Road Construction 2
12:26
Original ground level survey through auto Level in Road Construction
11:34
How to auto level survey calculation
04:17
How to set up an Auto level
05:59
Original Ground Level Survey Material Requirements
08:47
I Section all radius sharp weight in kg/m
02:57
Septic tank size for 5 to 50 user size
02:57
How to calculate shuttering area?
10:16
how to read structural drawing punching shear Steel
07:08
Cross sectional Area formula of Reinforcement bars
07:21
what is D2/162 & D2/533
02:13
Ratio of concrete mix
07:41
Calculate water cement ratio
03:52
Cement volume change to CFT
06:06
Steel cut length formula 02
03:33
Building Room Standard Height
04:27
Standard Door Height And Width In Meters
01:43
Brick Size
03:54
Drawing Sheet Title Block Dimensions
09:29
Bulding Design For plot Size
06:48
Drawing Sheet Standard Sizes
08:42
IRC Recommendations for Camber
15:01
one square meter plastering for cement sand calculation
12:13
Cement Sand Aggregate Quantity in Concrete M-20
05:04
Different Types Of Loads On Structures
06:19
Bent up bars for 45 Degree X =0.45
04:47
Bent up bars 30 , 45, 60 Degree
08:39
Classification of Roads width
14:23
cement send required for one square foot of plastering
04:53
Bent up bars 60 Degree
09:42
mean section area method calculation
08:43
volume of prismoidal formula for earthwork
05:58
Mid- sectional area method Earthwork
13:42
brick wall calculation formula
14:18
technical specification road work sub grade layer for road
06:48
Technical specification road work Granular sub-base (GSB) layer for road
08:15
Gravity retaining wall shuttering 02
08:16
Gravity retaining wall shuttering
03:05
water mix macadam specification
02:44
Water cement ratio
47:27
Bar bending schedule for beam
08:19
Technical specification road work PQC: Pavement Quality Concrete. Layer for road
09:15
Technical specification road work Bitumen macadam and bitumen concrete
05:34
volume of obelisk
05:04
cement test in field
06:36
Types Of Railway Stations
12:03
Minimum Window Size Relative To Room Size
04:58
Representative Fraction Of Scale
08:55
staircase detail drawing
07:31
Technical specification road work  Primer coat with bitumen emulsion
03:14
Clear Cover Reinforcement
10:29
Cost Difference Between Ground Floor & First Floor
08:14
Civil Engineering Unit Conversion
14:00
Building Design Room Standard & Minimum Size