Channel Avatar

IowaDOT @UC4RB_CW7XDtS95IhlG77zFQ@youtube.com

11K subscribers - no pronouns :c

If you are looking for more information about the Iowa DOT,


01:10
Iowa DOT Design Tabulations – DT6 Sheet Numbering and Printing
01:03
Iowa DOT Design Tabulations – DT4 Working With Your Project
01:07
Iowa DOT Design Tabulations - DT3 Creating a Project
00:25
Iowa DOT Design Tabulations - DT2 Project Dashboard
00:36
Iowa DOT Design Tabulations - DT1 Accessing Design Tabs
01:35
U.S. 63 Poweshiek/Tama Counties
12:01
I-380 Widening Project from 120th in Johnson County to U.S. 30 in Linn County
07:35
I-35/80 & U.S. 6 / Hickman Road Interchange Reconstruction Project
07:29
US 34 Super-2 Planning Study
05:52
Iowa 333 Grade and Pave - Fremont County
04:28
Iowa Aviation Economic Impact Report 2022
09:54
Iowa Aviation Economic Impact Report 2022
02:12
Iowa DOT MicroStation ORD Connect - E-Files Subgrade Land XML
03:37
Iowa DOT MicroStation ORD Connect - E-Files Proposed Surface Land XML
02:31
Iowa DOT MicroStation ORD Connect - E-Files Subgrade Terrain
03:51
Iowa DOT MicroStation ORD Connect - E-Files Proposed Surface Terrain
03:55
Iowa DOT MicroStation ORD Connect - E-Files 3D Breaklines
07:14
Iowa DOT MicroStation ORD Connect - Editing Terrains
01:43
Driving Through a Reduced Conflict Intersection (traveling south)
01:33
Driving Through a Reduced Conflict Intersection (traveling north)
12:52
Validation of Gyratory Mix Design in Iowa – Phase II
05:44
Iowa DOT MicroStation ORD Connect - Dual Profiles
02:30
Iowa's first dual-language road signs erected on U.S. 30 near Tama
09:47
U.S. 75 Location Study
15:25
Iowa Electric Vehicle Infrastructure Deployment Plan Webinar
15:01
Tow Plow Operation - Winter Operations Training Series 15 of 15
02:35
I-380 North from U.S. 6 toward Penn St. - I-80/I-380 interchange
01:59
East along I-80 to South along U.S. 218 - I-80/I380 interchange project
04:04
I-80/I-380 Spring 2022 Construction Update - I-80/I-380
01:26
Iowa DOT MicroStation ORD Connect - Earthwork T-Sheets
00:32
Girders Over I-80 - I-80/I-380 Construction Project
17:43
I-380 Widening and Wright Brothers Blvd Interchange Replacement
02:45
Iowa 13 Reconstruction Online Pubic Meeting
04:58
Iowa 2 Bridges Fremont County
00:31
Recognize and Report human trafficking
00:24
Girders Over I-80 - I-80/I-380 Construction Project
40:20
Effects of Soil Type on Vibration - Liquefiable Soils
07:25
Iowa DOT MicroStation Connect - Attaching Survey Legend Info
02:08
Iowa DOT MicroStation V8i SS10 - Attaching PDFs
08:43
Iowa DOT MicroStation Connect - Creating Scroll Plots
05:43
Iowa DOT MicroStation Connect - Attaching Rasters
01:30
Iowa DOT MicroStation Connect - Fixing Annotations
02:06
Iowa DOT MicroStation ORD Connect - Nested Reference Level Overrides
05:52
Is the IaRTN Working?
13:17
Mount Point Selection
08:10
Virtual RINEX Tool
15:48
U.S. 63 Super Two PEL Study
03:00
Iowa 3 in Dubuque County - Public Meeting
03:46
Vibration
00:32
I-380 at U.S. 6 - I-80/I-380 Construction Project
00:18
Girders over I-80 - I-80/I-380 Construction Project
17:06
SBC Computation Tool
00:12
Iowa Takes Off!
00:40
Runway
15:43
How the Shawn Havick Memorial Program Came To Be
02:28
Fall 2021 I-380 flyover from Forevergreen Road south to U.S. 6 - I-80/I-380
03:33
Fall 2021 I-80 Flyover from Ireland Ave. east to I-80/I-380 interchange
05:47
U.S. 218 Bremer County
05:47
Fall 2021 Construction Update - I-80/I-380
05:02
Specific Gravity Determining the W Weight